My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-12-04_PERMIT FILE - C1981033
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981033
>
2008-12-04_PERMIT FILE - C1981033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:38:34 PM
Creation date
1/28/2009 10:43:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Permit File
Doc Date
12/4/2008
Section_Exhibit Name
EXHIBIT 04 PERMITS FOR MINING
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />E. GENERAL 1140NITORING, SAMPLING AND REPORTING REQUDiEDiENTS <br />5. Flow Measurine Device <br />PART I <br />Page No. 18 <br />Permit No. CO-0044377 <br />If not already a part of the permitted Cacility, within ninety (90) days after the effective date of the permit, a flow <br />meazuring device shall be installed to give representative values of effluent quantities at the respective discharge points. <br />Unless specifically exempted, or modified in Pan I.B.S of this permit, a flow measuring device will be applicable at all <br />designated discharge points. <br />At the request of the Division, the permittee shall show proo(of the accuracy of any Bow-meazuring device used in <br />obtaining data submitted in the monitoring report. The Bow-measuring device must indicate values within ten (Itl) <br />percent of the actual Bow being discharged from the facility. <br />6. Sienatorv and Certification Requirements <br />(a) All reports and other information required by the Division, shall be signed and certified for accuracy by the <br />permittee in accord with the following criteria: <br />i. In the case of corporations, by a principal executive officer of at least the level of vice-president or his or her <br />duly authorized representative, if such representative is responsible for the overall operation of the facility from <br />which the discharge described in the form originates; <br />ii. In the case o(a partnership, by a general partner; <br />iii. In the case of a sole proprietorship, by the proprietor; <br />• iv. In the case o(a municipal, state, or other public Cacility, by either a principal executive officer, ranking elected <br />official, or other duly authorized employee. <br />(b) All reports required by permits, and other information requested by the Division shall be signed by a person az <br />described about or by a duly authorized representative of that person. A person is a duly authorized representative <br />only iF: <br />i. The authorization is made in writing by a person described above; <br />ii. The authorization specifies either an individual or a position having responsibility for the overall operation of <br />the regulated facility or activity such as the position o(plant manager, operator of a well or a well field, <br />superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for <br />environmental matters for the company. (A duly authorized representative may thus be either a named <br />individual or any individual occupying a named position); and, <br />iii. The written authorization is submitted to the Division. <br />(c) if an authorization as described in this section is no longer accurate because a different individual or position haz <br />responsibility for the overall operation of the facility, a new authorization satisfying the requirements of this section <br />must be submitted to the Division prior to or together with any reports, information, or applications to be signed by <br />an authorized representative. <br />(d) The permittee, or the duly authorized representative shall make and sign the following certification on all such <br />documents: <br />'i certify under penalty of law that this document and all attachments were prepared under my direction or <br />supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the <br />• information submitted. Based on my inquiry of the person or persotu who manage the system, or those persons <br />directly responsible for gathering the information, the information submitted is to the best of my knowledge and <br />belief, true, accurate and complete. 1 am aware that there are significant penalties for submitting false information, <br />including the possibility of fine and imprisonment for knowing violations.' <br />(NOBP NmnnOrr f{, 799f <br />
The URL can be used to link to this page
Your browser does not support the video tag.