Laserfiche WebLink
<br />I. TOPSOIL <br />Not applicable - topsoil already removed <br />A. REMOVAL and stockpiled. <br />Maximum tons removed per day <br />Tons removed per year <br />Proposed controls for topsoil removal: (cheek appropriate boaes) <br />^ Moist Material <br />^ Water Spray <br />^ Other (specify) <br />^ No Control <br />8. TOP8OIL STOCKPILE <br />U <br />Maximum stored at one time S,.oon tons. <br />Maximum stored per year 5.000 tons. <br />Length of time pile remains undisturbed 10 yrs. <br />Proposed controls for topsoil stockpile: (check app;opriate bos) <br />^ Watering times/day, or continuous sprinkler (to <br />maintain moist surface). <br />^ Chemical stabilizer (Type: ). <br />^ Compacting of piles, method <br />^ Enclosures: complete, or partial (check oae) <br />Reve etation Revegetation <br />g (Length of time till revegetation ). <br />CompTte <br />^ Other (specify) <br />^ No control <br />II. OVERBQRDEN <br />A. REMOVAL - Coal Waste <br />• <br />Maximum tons removed per day -~n0 <br />Tons removed per year 6,000 <br />Equipment used for removal Front end loa <br />Proposed controls for overburden removal: <br />® Moist Material <br />^ Water Spray <br />^ Other (specify) <br />^ No Control <br />(check appropriate boaes) <br /> <br />2 <br />