My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-02_PERMIT FILE - C1996084A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996084
>
2008-09-02_PERMIT FILE - C1996084A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2018 7:14:47 AM
Creation date
1/28/2009 10:31:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084A
IBM Index Class Name
Permit File
Doc Date
9/2/2008
Section_Exhibit Name
Exhibit 23 Bond Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 016 State :Colorado <br />Date <br />User <br />04/21/2008 <br />JRS Site :Lorencito Canyon Mine <br />Filename : C084-016 <br />Agency or organization name :Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action :Permit Renewal 02 <br />Task description :Grade Borrow Area 3 <br />..................................... <br />HOURLY EQUIPMENT COST <br />Basic machine :CAT 14H Horsepower : 215 <br />Attachment no. 1 :NA <br />Attachment no. 2 : Multi-shank ripper <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown Ownership cost/hour : $43.20 NA <br />Grader operating cost/hour : $48.51 100 <br />Ripper operating cost/hour : $0.00 0 <br />Operator cosUhour : $24.47 NA <br />Total unit cost/hour : $116.18 Total fleet cost/hour : $116.18 <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 2.70 acres <br />Source of estimated acreage :Table 2.05.4-1f <br />........................................ <br />HOURLY PRODUCTION <br />Selected application <br />Average grader speed <br />Selected blade angle <br />Effective blade length <br />Width of blade overlap per pass <br />Net grading or ripping width per pass <br />Unadjusted hourly unit production <br />Finish grading (0-2.5 mph) <br />1.25 mph <br />30 degrees' <br />12.10 feet <br />2.00 feet <br />10.10 feet ** <br />1.5303 acres/hour <br />* at 0 degrees, blade is perpendicular <br />to direction of travel. <br />"width of ripper beam on ripping applications <br />Fleet size : 1 grader(s) Total job time : 2.08 hours <br />Unit cost : $89.32 per acre Total job cost : $241 <br />County :Las Animas <br />PermiUjob # : C-96-084 <br />Abbreviation :none <br />xh <br />Z 3 -~ <br />~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.