My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-15_PERMIT FILE - C1992081
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081
>
2008-09-15_PERMIT FILE - C1992081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:36:15 PM
Creation date
1/27/2009 3:57:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Permit File
Doc Date
9/15/2008
Doc Name
CDPS Permit
Section_Exhibit Name
Tab 13 Appendix 13-1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART II <br />Page No. 30 <br />Permit No. COG-850000 <br />d. Compliance with a permit condition which implements a particular standard for sewage sludge use or disposal shall be <br />an affirmative defense in any enforcement actton brought for a violation of that standard for sewage sludge use or <br />disposal. <br />18. Requiring an Individual CDPS Permit <br />The Director may require any owner or operator covered under this permit to apply for and obtain an individual CDPS <br />permit if: <br />a. The discharger is not in compliance with the conditions of this General Permit; or, <br />b. Conditions or standards have changed so that the discharge no longer qualifies for a General Permit; or, <br />c. Data becomes available which indicates water quality standards may be violated. <br />The owner or operator must be notified in writing that an application for an individual CDPS permit is required. When an <br />individual CDPS permit is issued to an owner or operator otherwise covered under this General Permit, the applicability of <br />the General Permit to that owner or operator is automatically terminated upon the effective date of the individual CDPS <br />permit. <br />19. Requesting an Individual CDPS Permit <br />Any owner or operator covered by this General Permit may request to be excluded from the coverage by applying for an <br />individual CDPS permit. <br />20. Requesting Coverage Under the General Permit <br />The owner or operator of a facility excluded from coverage by this General Permit solely because that facility already has <br />an individual permit may request that the individual permit be revoked and that the facility be covered by this General <br />Permit. Such request shall be evaluated by the Division per criterion specified in Part I of this permit. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.