My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-15_PERMIT FILE - C1992081
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1992081
>
2008-09-15_PERMIT FILE - C1992081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:36:15 PM
Creation date
1/27/2009 3:57:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Permit File
Doc Date
9/15/2008
Doc Name
CDPS Permit
Section_Exhibit Name
Tab 13 Appendix 13-1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART II <br />Page No. 7 <br />Permit No. COG-850000 <br />4. Effluent Limitations -Post Mining Areas <br />Post-mining limitations may apply to outfalls serving reclamation areas, which have been returned to the required contour <br />and on which revegetation (specifically, seeding or planting) work has commenced. Limitations may also apply to ost <br />mining underground mine areas. The permittee may request consideration for change from active mining limitations to <br />post-mining limitations when these conditions have been met. <br />a. Post Mining Reclamation Areas -This category is subject to 40 CFR Part 434 Subpart E (Post Mining Areas). The <br />following limitations apply to reclamation areas. The federal ELG limitations would apply until bond release. If these <br />wastewaters are combined with other waters under Part I.B.1, then those limitations shall apply. If this wastewater is <br />combined with post mining underground mine wastewater, then the limitations in Part I.B.3.b apply to the combined <br />discharge. If this post mining wastewater is separate, then the following limitations apply. <br />Limitations Monitorin Sample . <br />Parameter 30-Day 7-Day Daily : Rationale g <br />,Avg. Avg. ,; - .Max.. ;.: Frequency Type <br />,.. <br />_________________________________General Permit Requirements------- ----__ _____ ________________ <br />Flow, MGD Report NA Report Discharge Evaluation Continuous / z <br /> Instantaneous <br />pH, s.u. N/A NA 6.5-9.0 Water Quality Standards Weekly <br />Total Suspended Solids, mg/1 30 45 NA State Effluent Regulations Weekly <br />Oil and Grease, mg/1 N/A NA 10 State Effluent Regulations Weekly <br />___________________________~Federal Effluent Limitation Guidelines----------------- ---_~__ <br />Settleable Solids, ml/1 Report NA 0.5 Federal ELG Weekly <br />_____~__~__________W_______~ ______Site Specific Limitations--- ------_________________ __~___~ <br />Total Dissolved Solids, mg/1 * Report NA Report Salinity Regulations Quarterly <br />Total Phosphorus (as P), mg/I ** Report NA Various Control Regulations Monthly <br />Total Recoverable Iron, ug/1 <br />Other Pollutants of Concern <br />Whole Effluent Toxicity (WET) <br />Chronic <br />Acute <br />1000 NA NA Water Quality Standards <br />Various NA Various Water Quality Standards <br />Stat Diff and IC25 > IWC State Permit Limitations <br />LC50 > 100% State Permit Limitations <br />Weekly <br />Weekly <br />Quarterly <br />Recorder / <br />In-situ 2 <br />Grab <br />Grab <br />Visual a <br />Grab <br />Grab <br />Grab <br />Grab <br />Grab <br />3 Grab/Test <br />Grab <br />Footnotes I-4, * , ** ,and *** can be found under Part I.B.1 and Part I.B.2. <br />ALTERNATE LIMITATIONS FOR POST-MINING RECLAMATION AREAS <br />Any discharge or increase in the volume of a discharge from a reclamation area, caused by precipitation within any <br />24-hour period greater than the 10-year, 24-hour precipitation event (or snowmelt of equivalent volume) ma <br />substitute the following limitations for these specific parameters only, subject to burden of proof requirements <br />described in Part I.B.6. <br />Limitations Monitoring Sample <br />Parameter 30-Day ` Z-Day .Daily Rationale 1 <br />Avg. Avg. Frequency Type <br />:< Max.... <br />_. ._ _. <br />--------------------------------Federal Effluent Limitation Guidelines----_______________~~________ <br />Settleable Solids, ml/1 Report NA Report Federal ELG Weekly Grab <br />b. Post Mining Underground Areas -This category is subject to 40 CFR Part 434 Subpart E (Post Mining Areas). The <br />following limitations apply to underground areas. The federal ELG limitations would apply until bond release. If <br />these wastewaters are combined with other waters under Part I.B.1, then those limitations shall apply. If this <br />wastewater is combined with post mining reclamation area wastewater, then these limitations apply to the combined <br />discharge. If the post mining wastewater is separate, then the following limitations apply. Discharges of mine <br />drainage from underground workings of underground mines which are not commingled with discharges eligible for <br />alternate limitations set forth in this section shall in no event be eligible for the alternate limitations set forth in this <br />section. <br />
The URL can be used to link to this page
Your browser does not support the video tag.