My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-09_PERMIT FILE - C1980007 (6)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2008-06-09_PERMIT FILE - C1980007 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:32:37 PM
Creation date
1/27/2009 3:41:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
6/9/2008
Doc Name
Exhibit 79 Part 2
Section_Exhibit Name
Exhibit 80 Drilling Activities - TR111
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Response to Commenfs <br />• <br />C: <br />• <br />Table 5-1 <br />DEIS Comments and Responses <br />Commenter Comment Comment/Response <br /> <br /> and monitoring on disturbance areas within the MCC's permit area. The <br /> GMUG experience with noxious weed management in this particular area <br /> indicates that consistent application of approved herbicides is effective at <br /> controlling the noxious weed infestations. <br />Western Slope 4 WSERC has had several conversations with mine managers about alternate <br />Environmental methods of venting methane that would not require road construction, and we <br />Resource Council are aware that the mine has tried interior vent systems, which failed, <br /> considered directional drilling, which is not feasible because of the shallow <br /> overburden, and considered helicopter delivery ofwell-drilling equipment so <br /> as to avoid road construction. <br /> RESPONSE: The FEIS has been changed to reflect in snore detail the various <br /> methods of methane management employed by the mine. See Chapter 2 <br /> Alternatives Considered but Eliminated from Detailed Study. <br />Western Slope 5 For due diligence, we believe that the EIS should explicitly analyze these and <br />Environmental other options that avoid road construction. <br />Resource Council RESPONSE: See WSERC Comment #4. <br />Western Slope 6 In places, the draft EIS makes assertions that are not backed up by data or <br />Enviromnental explanation. For example, there is a section on page 31 that states "in places <br />Resource Council the overburden is not thick enough that directional drilling either from outside <br /> the IRA is practical or possible" (sic). We would like to see more analysis <br /> presented, including numerical descriptions of the depth of overburden and an <br /> analysis of tecluiical limitations on directional drilling that preclude its use <br /> given the depth of overburden. <br /> RESPONSE: According to MCC's experience drilling directionally in the B <br /> seam (project file); directional holes must be drilled such that the producing <br /> part of the well above the seam is vertical. This distance was approximately <br /> 250 feet in the B seam methane drainage wells and is projected to be 150 feet <br /> minimum in the E seam methane drainage wells. If such holes fail to achieve <br /> vertical in this portion of the well, they are subject to collapse and ineffective <br /> as degas holes. <br /> The maximum safe angle of drilling (above this minimum vertical section) <br /> that can be achieved by the drilling equipment available is 45 degrees. The <br /> drill mast is set at 45 degrees to begin the holes. This angle must be gradually <br /> corrected to vertical during the drilling process. <br /> The maximum allowable dog-leg in directional drilling is 4 percent, in order <br /> to be able to successfully install casing in the hole. <br /> Given the parameters of overburden depth (1,000 feet for the E Seam), as it <br /> relates to physical constraints of directional drilling, MCC is unable to reach <br /> the required methane drainage targets from outside the roadless boundary. <br /> Chapter 2, Alternatives Considered but Eliminated from Detailed Study of the <br /> FEIS includes this information. <br />Western Slope ~ In places the draft EIS makes assertions that are not backed up by data or <br />Enviromnental explanation.... Another example is the statement on page 31 [DEIS] with <br /> res ect to horizontal boreholes that "these es of boreholes alone are <br />Deer Creek Ventilation Shaft and E Seam Methane Drainage Wells FEIS <br />161 <br />
The URL can be used to link to this page
Your browser does not support the video tag.