My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-09_PERMIT FILE - C1980007 (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2008-06-09_PERMIT FILE - C1980007 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:32:37 PM
Creation date
1/27/2009 3:38:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
6/9/2008
Doc Name
Exhibit 79 Deer Creek Shaft and E Seam Methane Drainage Wells Project Final-August 2007
Section_Exhibit Name
Exhibit 80 Drilling Activities - TR111
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alternatives Considered in Detail <br />Table 2-1 <br />_:~ Design Criteria <br />Topic Design Criteria for the Proposed Action <br />_ 15. Cross slopes will be maintained on access roads to promote removal <br />of water from the road surface. Surface drainage structures shall be <br />constructed at appropriate intervals to divert water from roadway <br />surface..... Relief ditches at regular intervals to direct drainage off <br />of the road grade and into vegetated areas. <br />16. Ditches would be allowed to vegetate or include large rocks or <br />stones to slow the velocity of drainage and allow sediment to settle <br />out. <br />17. Where drainage ditches are installed to direct runoff away from the <br />road, water bars or hay bale dikes would be installed perpendicular <br />to the flow direction of the ditch to reduce runoff velocity and settle <br />out sediment on steeper grades. <br />18. Road construction plans would identify specific locations of <br />drainage features and BMPs for approval by the FS engineer/permit <br />administrator prior to construction. <br />19. Road design packages will be submitted to the FS for approval prior <br />to any construction activity. Roads open to the public (Levels 3, 4 <br />& 5) will require written approval prior to any construction activity. <br />20. Project access roads will be gated and closed year-round to the <br />general public. Persomlel with access will be monitored to insure <br />such access is not abused; i.e., no access during non-working hours <br />for purposes unrelated to the project such as hunting or off-roading. <br />21. All new access roads constructed for the sole use of this project will <br />be decommissioned by full obliteration when no longer needed for <br />the project and reclaimed. <br />22. Road work will be performed only upon authorization of the <br />District Ranger and comply with the terms of MCC's Road Use <br />Permit. Roads will be designed and constructed to provide <br />maximum stability and protect the surface resource. Best <br />Management Practices will be used in designing the roads and <br />during construction. All roads will be upgraded or constructed to <br />USFS specified standards for either temporary or classified roads, <br />as appropriate and approved by the USFS, with a design speed of <br />15 miles per hour. <br />• <br />Road Use <br />Permit(FSM <br />2733.04b and <br />FSM 7730) , <br />WCPH(FSH <br />2509.25) <br />WCPH (FSH <br />2509.25) <br />Project Plan, <br />WCPH (FSH <br />2509.25) <br />Road Use <br />Permit (FSM <br />2733.04b and <br />FSM 7730) , <br />Forest <br />Service <br />Roads Policy <br />Forest Plan <br />RACR <br />RACR, 36 <br />CFR 228 E, <br />Road Use <br />Permit (FSM <br />2733.04b and <br />FSM 7730) <br />Road Use <br />Permit (FSM <br />2733.04b and <br />FSM 7730), <br />MCC Project <br />Plan <br />Deer Creek Ventilation Shaft and E Seam Methane Drainage Wells FEIS 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.