E1 Longwall Panel Methane Drainge Wells Project Plan
Section_Exhibit Name
Exhibit 80 Drilling Activities - TR111
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E 1 Longwall Panel Methane Drainage Wells Project Plan <br />Technical Revision No. 111; <br />Page 8 of 13 <br />The pad footprints will be kept small (approximately 0.5 acres) the estimated disturbance <br />associated with each pad will range from 0.25-acre to 2.0 acres. Total disturbance for this E 1 <br />Panel project including the 8,005-feet of required low-volume roads and the 14 pads will be <br />approximately 10 acres. The road alignment and pad locations are depicted on the attached map, <br />E Seam Methane Drainage Well Drilling. <br />PRE-DRILLING ACTIVITIES <br />Prior to any construction or drilling activities, an on-site inspection of proposed drill sites and <br />access routes will be conducted with representatives from USFS to discuss site-specific concerns. <br />USFS will be notified at least 48 hours before any construction or drilling equipment is <br />mobilized into the project areas. Construction and drilling activities will be supervised by a <br />project representative of Mountain Coal Company, L.L.C. Any significant proposed changes in <br />the project after permit approval would be reviewed with the appropriate regulatory agencies <br />before changes take effect. <br />Staging areas to be used by the drilling contractor will be used in a manner to minimize damage <br />to the vegetation. Any surface disturbance to these sites will be re-graded and seeded to promote <br />rehabilitation. <br />Access routes will be maintained to accommodate full sized 4X4 pickup trucks, ATVs, and <br />required drilling equipment, including but not limited to the following: truck mounted or skid <br />mounted drill rig, air compressors and\or booster, rig-up truck, portable water tanks, boom truck, <br />utility trailer, drill pipe lay-down rack, crew trucks, geophysical logging truck and mobile water <br />carriers. <br />Roads utilized in the project will be maintained with water bars and appropriate sedimentation <br />controls as required dtuing the drilling phase. A D9 bulldozer or its equivalent will be used to <br />prepare the road for travel and assist in mobilizing the drill equipment to the drill sites. <br />Additional equipment expected to be used in opening, maintaining, and reclamation may include <br />a rubber-tired backhoe, rubber tired grader, rubber tired loader, roller compactor and atrack- <br />mounted excavator. <br />Brush removal may occur at the proposed drill sites however, if trees are encountered, MCC will <br />remove the trees in accordance with USFS guidelines for timber removal. Drill site pads of <br />approximately from 0.25-acre to nearly 2.0 acres will be constructed to acconnnodate the drill <br />equipment and drill cuttings sump or mud pits. Drill pads will be constructed only as large as <br />necessary. <br />Topsoil will be stripped, stockpiled, and identified with a sign. Stored topsoil will be placed in a <br />separate pile located outside of drainages, with a sign identifying the pile as "Topsoil" will be <br />placed so as to prevent unintended contamination, compaction, or use for other than reclamation <br />purposes. Alternative sediment controls (slash, silt fence or straw wattles) will be used; and the <br />pile will be seeded in the first seeding season following its construction using a seed mix that <br />will stabilize erosion. This topsoil will be used in the reclamation phase of the program. <br />8 <br />