My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-07_PERMIT FILE - C1981047 (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981047
>
2008-10-07_PERMIT FILE - C1981047 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:36:57 PM
Creation date
1/27/2009 3:11:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Permit File
Doc Date
10/7/2008
Section_Exhibit Name
Section 2.05 Operation and Reclamation Plans
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• (b)(iii) Ground and Surface Water Monitoring Plan: Results of ground and surface <br />water monitoring are incorporated in the Hydrology section of the permit application, pages <br />38 - 45ii, and in annual hydrologic reports submitted to the Division. Monitoring schedules <br />described in the Hydrology section were used to collect baseline data. The following is the <br />current monitoring schedule. <br />A. Ground Water <br />1. Mine Inflows -The Blue Ribbon Mine was sealed in 1986; therefore, no <br />further mine inflow studies or mine inflow maps will be prepared. <br />2. Alluvial Well -The alluvial well was eliminated during reclamation work in <br />1986; therefore, no further monitoring of it will be done. <br />3. Springs -The spring at the base of the bench near the former pond 2 was <br />collected in the south underdrain during the bench stabilization project during <br />1984 and 1985, so it will be monitored with the underdrains. The spring near <br />the south end of the disturbance boundary on the haul road switchback <br />never flowed enough water to measure so it will no longer be monitored. <br />• The flow in the draw north of the mine was monitored as a spring. <br />Monitoring on this draw will be discontinued. <br />4. Restabilized Bench Piezometers -Four piezometers, P-1 thru P-4, were <br />installed during the bench restabilization project in 1985. Two piezometers, <br />P-5 & P-6, were installed on the face of the bench late in 1989. The <br />piezometers will be monitored quarterly forwater level. Results of monitoring <br />will be submitted to the Division in the annual hydrologic report. <br />A 1993 bench slump occurred immediately south of monitoring point P-6. <br />The slump distorted (pushed out) the cover material where P-6 was located. <br />P-6 was destroyed when the bench slump was regraded. P-6 will no longer <br />be monitored and it will not be replaced based on the rationale presented <br />below: <br />L J <br />-124- 2/06 <br />mR-~ 6 <br />APPRp4ED 3/~ 4~a 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.