My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-26_REVISION - C1981012 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2009-01-26_REVISION - C1981012 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:06 PM
Creation date
1/27/2009 12:33:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REVISION
Doc Date
1/26/2009
Doc Name
Cost Estimate (Memo)
From
Jim Stark
To
Kent Gorham
Type & Sequence
RN5
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : <br />Scraper Bowl (volume) Basis : <br />sheet 2 of 2 <br />Material weight : 2,900 pounds/LCY <br />Material description : <br />Decomposed rock - 50% Rock, 50% Earth <br />Rated payload : 48,000 pounds <br />Payload capacity : 16.55 LCY <br />Struck volume : 15.70 LCY <br />Heaped volume : 21.00 LCY <br />Average volume : 18.35 LCY <br />Adjusted capacity : 16.55 LCY *** <br />hourly production reflects volume per scraper pair on push-pull models <br />Cycle Time : Job Condition Corrections : Site altitude (ft.) : 7,500 <br /> Scraper Push dozer Source <br />Scraper loading time 0.40 minutes Altitude adj.: 1.000 1.000 (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 0.830 (Cat HB) <br />* load time per scraper pair on push-pull models Net correction : 0.830 0.830 <br />Travel time : <br />Road condition description :Rutted dirt, little maintenance, no water, 2" tire penetration <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 625 -25.00 5.00 -20.00 960 0.85 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : <br />Haul time : 0.85 minutes <br />** travel time for each segment is adjusted for acceleration/deceleration. Return time : 1.08 minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 2.92 minutes <br />Unadjusted unit production/hour : 339.84 LCY/hour *** Adjusted for job conditions : 282.07 LCY/hour <br />Optimal number of scrapers per push dozer : 4 Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 564.14 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 564.14 LCY/hour <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 219.69 Hours <br />Unit cost : $1.101 /LCY Total job cost : $136,399 <br />
The URL can be used to link to this page
Your browser does not support the video tag.