My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-26_REVISION - C1981012 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2009-01-26_REVISION - C1981012 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:06 PM
Creation date
1/27/2009 12:33:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REVISION
Doc Date
1/26/2009
Doc Name
Cost Estimate (Memo)
From
Jim Stark
To
Kent Gorham
Type & Sequence
RN5
Email Name
KAG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Date : 26-Jan-09 Permit C-1981-012 Site: New Elk Mine <br />User: JRS State : Colorado <br /> Filename: C012-OOg County: Las Animas <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Permit Renewal 05 <br /> Topsoil Replacement Tasks - Tasks 060-079 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />060 Replace Topsoil to Pond 004 7.20 $1,456 <br />061 Replace Topsoil to Completed Development Waste Pile 10.71 $6,696 <br />062 Replace Topsoil to Remaining Development Waste Pile 3.73 $2,333 <br />063 Replace Topsoil to Area East of Pond 005 0.83 $538 <br />064 Replace Topsoil to Pond 005 1.71 $346 <br />065 Replace Topsoil to Southwest Coal Stockpile 2.04 $1,304 <br />066 Replace Topsoil to Area Along Highway 12 2.00 $1,294 <br />067 Replace Topsoil to Stockpiles South of Highway 12 4.11 $2,653 <br />068 Replace Topsoil to Area Under Conveyor 1.74 $1,088 <br />069 Replace Topsoil to Raw Coal Storage Stockpile 2.50 $1,574 <br />070 Replace Topsoil to Tiny DR Area in Large DNR Area 0.13 $83 <br />071 Replace Topsoil from Prep Plant to Pond 007 3.78 $2,419 <br />072 Replace Topsoil to Clean Coal Storage Stockpile 1.82 $1,126 <br />073 Replace Topsoil to East Extension of River Pumphouse 0.44 $278 <br />074 Replace Topsoil to Embedded Waste Area 4.03 $2,599 <br />075 Replace Topsoil to Topsoil Borrow Area 0.86 $565 <br />076 Replace Topsoil to Refuse Disposal Area Operational Surface 75.43 $45,101 <br />077 Replace Topsoil to Four Bench Slopes 13.31 $7,960 <br />078 Replace Topsoil to RDA Pond 24.97 $5,052 <br />079 Replace Topsoil to RDA Access Road 6.87 $4,107 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Total Direct Cost 168.21 $88,572 <br />jrs 1/26/2009
The URL can be used to link to this page
Your browser does not support the video tag.