My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-03_PERMIT FILE - C1982056A (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2008-10-03_PERMIT FILE - C1982056A (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:36:50 PM
Creation date
1/27/2009 10:59:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
10/3/2008
Doc Name
Pages 2.05-1 to 2.05-64
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The drilling of the shaft resulted in minimal surface disturbance. A drill pad approximately 200 x 200 <br />feet was constructed at the resulting site in 1,450 CY of cut and fill. Available topsoil was salvaged and <br />stockpiled for future reclamation of the site immediately northeast of the drilled pad. Approximately 18 <br />inches of topsoil derived from Cochetopa Loam is available for salvaging (222 CY). Casing and other <br />. drilling supplies were stockpiled on the borehole pad. <br />After topsoil removal, two mud pits 10 x 10 x 7.5 feet were dug adjacent to the drillhole. Drilling fluids <br />and cuttings were discharged into the adjacent pits, allowing settling in one pit, with water decanting into <br />the adjacent pit. Drilling muds were used during the course of drilling the surface collar and pilot hole. <br />The surface collar was approximately 5.0 feet in diameter, and the pilot hole was 11 inches in diameter. <br />The collar was comprised of two components; a surface concrete pad and a liner or casing that extends to <br />bedrock. A concrete centering base is at the bottom of the liner. <br />The concrete pad was poured around the liner and was approximately 14x 10 x 2 feet, however, the liner <br />extends through the pad, reducing the amount of concrete needed to construct the pad. Approximately 8.9 <br />CY of concrete was required to construct the pad. <br />After the collar and liner were in place and the pilot hole was completed, raise-boring methods were used <br />to complete the hole. The hole was reamed to a final diameter of 4.33 feet and a 48-inch diameter steel <br />casing was cemented in place from 50 feet below the bottom of Twentymile Sandstone to the top of the <br />concrete centering pad. The remainder of the casing below the cement hangs in the hole. The hole is <br />approximately 1,100 feet in depth. The 4-foot diameter casing extrudes 4 to 6 inches out of the concrete <br />surface pad. A cap to regulate intake air flow was installed. A fence was installed around the drill pad to <br />prevent access by cattle, after completion of the hole. Access was derived from an existing light-use road <br />running up to an old electrical borehole. A series of culverts were placed under the existing road as <br />shown on Figure 23, General Location of Escape, Shaft. The design for the culverts can be found in <br />Exhibit 8D Escape Shaft/Light-Duty Road Culvert Design: TCC constructed an additiona125-foot wide <br />road at a 4 percent grade to access the site. The 1,300-foot long road is graveled with 0.5 feet of 6-inch <br />pit-run gravel. <br />Buffalo Fore Fan Silencer (MR 03-1871 <br />A new silencer will be installed on the Buffalo fan at the NW Mains Ventilation Shaft location. <br />Installation of the silencer will require construction of foundations utilizing concrete piers and concrete <br />grade beams. The foundation will require eight concrete piers (6-inch radius x 20 feet deep) and then <br />placement of two concrete grade beams (12" x 2' x 31') on top of the piers. The concrete grade beams <br />will be reinforced with three #5 rebar, and #4 stirrups spaced at 8 inches on center within 3 feet of the <br />piers, and spaced at 16 inches on center at all other locations. <br />The installation of the silencer will occur within the existing disturbed area. The silencer is essentially a <br />box containing baffles, which will be approximately 31 feet long, 21 feet wide, and 20 feet high.. The <br />location of the vent shaft and silencer. is shown on Map 24. <br />NW Mains Ventilation Fan Sound Deflector/Absorber (MROS-192) <br />As part of TCC's ongoing efforts to minimize potential mine impacts on area residents, a sound <br />deflector/absorber unit will be installed on the NW Mains Ventilation Fan. The unit is designed to deflect <br />fan exhaust, and to both absorb and deflect any associated sound approximately 90 degrees from its <br />current discharge direction. Installation of the sound deflector/absorber unit will require construction of <br />foundations utilizing concrete piers and concrete grade beams. The foundation will consist of twelve <br />concrete piers (12-inch diameter x 15-21 feet deep), supporting two curved reinforced concrete grade <br />TR07-61 2.05-45.8 07/14/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.