My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-10-03_PERMIT FILE - C1982056A (6)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1982056A
>
2008-10-03_PERMIT FILE - C1982056A (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:36:51 PM
Creation date
1/27/2009 10:59:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
10/3/2008
Section_Exhibit Name
2.03 Legal, Financial, Compliance and Related Information
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mine Identification - DMG Pemut No. C 82-056 <br />MSHA ID No. -OS-03836; Issued 1983 <br />Violation Identification: CV -2006-006, September 13, 2006 <br />Issuing Regulatory Authority: Division of Reclamation, Mining, and Safety <br />Brief Description of Violation: Failure to dispose of coal fines in accordance with the approved permit. Failure to <br />minimize disturbance to the prevailing hydrologic balance. Failure to maintain Sedimentation Pond E so as to provide <br />adequate runoff capacity for the 10-year, 24-hour precipitation event. Failure to prevent an unapproved disturbance <br />within 100 feet of an internuttent stream. -Rupture in buried washplant thickener underflow line caused coal fines <br />slurry to flow to and partially fill Sedimentation Pond E, resulting in coal fines discharge to Foidel Creek. <br />Date. Location and Type of Administrative Proceedings⢠Notice of Proposed Assessment issued on October 17, 2006 <br />for a proposed civil penalty of $2,050.00. A Notice and Order to Pay Fixed Penalty was issued September 19, 2006. <br />TCC submitted a request for an Assessment Conference on October 26, 2006, and worked with the CDRMS on <br />scheduling of the Assessment Conference consistent with the Abatement schedule. Given time and weather constraints, <br />and the desire to address all abatement requirements in a timely manner, TCC and the CDRMS jointly agreed to forego <br />the Assessment Conference, and payment was submitted on December 19, 2006. <br />Current Status: Abatement Steps 1-11 were completed on or before the scheduled abatement dates. NOV terminated <br />on February 9, 2007. <br />Actions Taken to Abate Violation: On discovery of the coal fines discharge (09/11/06), TCC took immediate steps to <br />cease discharge, contain the discharged material, assess downstream migration of coal fines, and contact appropriate <br />agencies. Consultation with the agencies resulted in development of an 11-Step Abatement Plan: <br />Step 1 -Cease discharge (Abatement date 09/13/06 -Completed 09/11/06 -Abated 09/13/06) <br />Step 2 -Repair the broken thickener underflow line (Abatement date 09/13/06 -Completed 09/11/06 -Abated <br />09/13/06) <br />Step 3 -Perform immediate damage control activities for Foidel Creek (Abatement date 09/13/06 -Completed <br />09/11/06 -Abated 09/13/06) <br />Step 4 -Notify CDPHE-WQCD, CDOW, and USACE (Abatement date 09/13/06 -Completed 09/12/06 - <br />Abated 09/13/06) <br />Step 5 -Notify downstream water owners/users (Abatement date 09/29/06 -Completed 09/19/06 (phone <br />contact) with follow-up letter on 09/19/06 -Abated 09/22/06) <br />Step 6a -Assess Pond E discharge (Abatement date 10/13/06 -Completed 10/13/06 -Abated 10/13/06) <br />Step 6b -Assess receiving water quality (Abatement date 10/10/06 -Completed 10/10/06 -Abated 10/10/06) <br />Step 6c -Contain the coal fines discharge (Abatement date 10/03/06 -Completed 09/11/06 -Abated 09/13/06) <br />Step 6d -Assess potential toxicity impacts (Abatement date 10/03/06 -Completed 09/12/06 -Abated <br />10/03/06) <br />Step 6e -Provide estimate of total discharge volume (Abatement date 10/13/06 -Completed 10/13/06 - <br />Abated 10/13/06) <br />Step 6f -Submit written report to CDRMS (Abatement date 10/13/06 -Completed 10/13/06 -Abated <br />10/13/06) <br />Step .7 -Submit plans for abatement of potential long-term impacts with schedule and concurrence from <br />jurisdictional agencies (Abatement date 10/10/06 -Completed 09/14/06 except for agency concurrence - <br />Abated 10/06/06) <br />Step 8 -Continue surface water monitoring and submit copy of 3`~ Quarter DMR to CDRMS (Abatement date <br />10/30/06 -Completed 10/30/06 -Abated 10/30/06) <br />Step 9a -Reestablish and document temporary stormwater storage and discharge capabilities consistent with <br />approved design ((Abatement date 11/17/06 -Abated 11/17/06) <br />Step 9b -Remove coal fines accumulation from north pond area and dispose of coal fines in existing coal <br />refuse area (Abatement date 01/31/07 -Abated 01/30/07) <br />Step 10 -Submit as-built drawings for Pond E restoration along with documentation of treatment adequacy <br />(Abatement date 02/09/07 -Abated 02/08/07) <br />Step 11 -Submit final clean-up report to CDRMS, CDPHE-WQCD, CDOW, and USACE (Abatement date <br />02/09/07 -Abated 02/09/07) <br />Final Resolution: The NOV was terminated on February 9, 2007, and TCC submitted payment for the $2,050.00 <br />civil penalty on October 15, 2006. <br />TR08-64 2.03-20 08/2]/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.