Laserfiche WebLink
M12 ')0-14 t - 1 -\CILI'I'll?S .AllDIT1ONS: 12OM 5"fOCKI'ILl? .4NU S'1'OKGIt 'I~NUCK til?L1~-LOAllING <br />Sl'SFI?!VI <br />I. I:U~9SfOCKPILEADDITIONS <br />~1. Non-I'owercd l'ripper <br />Dimensions: <br />Steel: 20' x 20' x 40~ = 16,000 cf <br />Removal Costs: <br />Steel: I6,OOOcf x ISc/cf = $ 2.880.00 <br />Subtotal = $ 2,SS0.00 <br />I;. Reclaim Tunnel and Additional Feeder <br /> Iimensions: <br /> Steel: I80' x 12' x 3' = 17,280 cf <br /> Concrete: 2 x I80'[ (2' x ~}')+(I' x 3') ] = 3,9(,9 cf <br /> Removal Costs: <br /> Steel: 17,280cf x 18c/cf = $ 3,110.00 <br /> Concrete: 3,969 x 23</cf = $ 913.00 <br /> Subtotal = $ 4,023.00 <br />II. S"fO KGR TRUCK SELF-LOADING SYSTEM <br />\. Multi-Plate Tunnel <br /> Dimensions: <br /> Steel: 100' x ><(6')2 1 1,3 10 cf <br /> Concrete: 100 cy x 27 cf/cy 2,700 cf <br /> Removal Costs: <br /> Steel: 11,310 of x 18c/cf = $ 2,036.00 <br /> Concrete: 2,700cf x 23c/cf = $ 621.00 <br /> Subtotal = $ 2,657.00 <br />Li. Feeders <br /> Dimensions: <br /> Steel: 2(3' x 4' x I') = 24 cf <br /> Concrete: 20 cy x 27 = 540 cf <br /> Removal Costs: <br /> Steel: 24 cf x 18c/cf = $ 4.00 <br /> Concrete: 540 cf x 23</cf = $ 124.00 <br /> Subtotal = $ 128.00 <br />C. Escape Tube <br /> Dimensions: <br /> Steel: 50' x s(3)2 = 1,414 cf <br /> Concrete: I cy x 27 = 27 cf <br /> Removal Costs: <br /> Steel: 1,414 cf x 18c/cf = $ 255.00 <br /> ('ntur~[p: 27 tf .x 2i c/%f = $ fi.90 <br /> Subtotal $ 261.00 <br />• Say $ 300.00 <br />MR 97- 154 72 10/2/97 <br />