Laserfiche WebLink
SHORT AND LONG TERM SEDIMENT CONTROL MEASURES <br />FOR THE POND 12 WATERSHED <br />Short Term Sediment Control Measures <br />• Approved Pond 012A design (I'R-36; Appendix 13-12.1, Sediment Pond SEDCAD4 results) <br />Associated Postmining Channels (I'R-36; Appendix 13-12.3, Post Mining Channels <br />SEDCAD results) <br />Exhibit 13-12.1A, Permanent Ponds and Pond Watersheds (I'R-36) <br />Exhibit 20-2, Post-Mining Topography Map (TR-36) <br />Exhibit 20-ZB, Post-Mining Channel Profiles (TR-36) <br />• Under Review Pond 012 and Pond 012A Two-Pond System Design (I'R-37; Appendix 13-12.1-F, <br />Sediment Pond SEDCAD4 results) <br />Assodated Postmining Channels (IR-37; Appendix 13-12.3, Post Mining Channels <br />SEDCAD results) <br />Exhibit 13-12.1A, Permanent Ponds and Pond Watersheds (I"R-37) <br />Exhibit 20-2, Post-Mining Topography Map (TR-37) <br />Exhibit 20-2B, Post-Mining Channel Profiles SIR-37) <br />Long Term Sediment Control Measures <br />• Approved Pond 012A design (IR-36; Appendix 13-12.1, Sediment Pond SEDCAD4 results) <br />Associated Postmining Channels (TR-36; Appendix 13-12.3, Post Mining Channels <br />SEDCAD results) <br />Exhibit 13-12.1A, Permanent Ponds and Pond Watersheds (IR-36) <br />Exhibit 20-2, Post-Mining Topography Map (TR-36) <br />Exhibit 20-2B, Post-Mining Channel Profiles (TR-36) <br />• Under Review Pond 012 and Pond 012A Two-Pond System Design (TR-37; Appendix 13-12.1-F, <br />Sediment Pond SEDCAD4 results) <br />Associated Postmining Channels (IR-37; Appendix 13-12.3, Post Mining Channels <br />SEDCAD results) <br />Exhibit 13-12.1A, Permanent Ponds and Pond Watersheds (IR-37) <br />Exhibit 20-2, Post-Mining Topography Map (I"R-37) <br />Exhibit 20-2B, Post-Mining Channel Profiles (TR-37) <br />• To Be Submitted Pond 012A As-built (15L Qtr 2009) <br />Pond 012 Slide Remediation Plan (3~d Qtr 2009) <br />TR-38 12/08 <br />