l <br />TABLE 19-1 <br />PROJECTED RECLAMATION SCHEDULE <br />Mining Period Permitted Disturbance <br />(cumulative ac)' Reclamation Period Actual/Projected <br />Disturbed Area <br />Reclamation (ac s <br />1995-1999 977.0 <br /> <br />2000-2001 989.6 <br /> <br />2002-2003 1,019.0 1995-2003 233.3 <br /> <br />2004+ 1,019.0 2004 64.5 <br /> <br /> 21705 96.6 <br /> <br /> 2006 182.0 <br /> <br /> 2007 233.4 <br /> <br /> 2008+ --- / 38.8 <br /> <br />Total Permitted 1,019.0 <br />(Actual 848.6) 809.8/848.6 <br />Notes: <br />Actual acres disturbed and reclaimed are from Annual Reclamation reports. <br />' Cumulative permitted disturbance acres -corresponds to current aerial photography. <br />x Reclamation areas reflect acreages reported in the Annual Reclamation Reports. <br />a Reclamation Period 2008+ includes road corridors and ponds. <br />a The difference in acreages between "Permitted Disturbance" and "ActuallProjected Disturbed <br />Area Reclamation" reflects areas that were permitted to be disturbed but which were never <br />actual/ disturbed <br />that will receive spoil material during the excavation process, and cannot be final graded until excavation <br />advances away from the box cut area. Further discussion of this situation is presented in Tab 12 and 20. <br />In order to achieve the designed postmining landform, the necessary backfill material must be available to <br />pertomt area grading on internal spoil. Generally, adequate material will not be available until excavation <br />has developed at least two spoils. However, Rule 4.14.1(1)(c) allows up to four spoil ridges behind the pit <br />being worked. When the pit configuration is regular (e.g., typically, interior spoil), and where sufficient area <br />is available (i.e.: long, straight pits) to perform "area grading", Seneca strives to maintain backfilling and <br />grading within two spoil rows. Under these conditions, it takes approximately 90 to 120 days to cycle the <br />dragline from one end of an active pit and back, creating two spoil rows. Due, however, to coal market and <br />operation considerations, it is periodically required to also cycle the dragline from the south to the north and <br />back to access an upper spoil bench or to perform rehandle operations. This can add 60 to 90 days to the <br />dragline cycle before a single spoil row is created. Therefore, due to the depth of overburden, and <br />configuration and length of the pit, it can take over one year to generate four spoil rows. This typical cycle <br />has been drastically reduced since 2003 due to the limited areas of remaining reserve and the pit <br />arientations required due to steep grades. <br /> <br /> <br />• <br />Four spoil peaks will also be created by other mining situations. First, in certain locations such as along the <br />ramps and the haul road, in the box cut spoil area, along certain inside or outside cunr s, along irregular <br />TR-37 „~ ~ Rea~osed 01/08 <br />