Laserfiche WebLink
• TABLE OF CONTENTS <br />Page <br />Introduction ~ 1 <br />Embankment and Excavation 1 <br />Design Analysis 1 <br />Summary 2 <br />Construction Summary 2 <br />Conclusion 3 <br />Addendum 13-20-A 10-Year, 24-Hour SEDCAD (Input and Output) <br />Addendum 13-20-B 25-Year, 24-Hour SEDCAD (Input and Output) <br />Addendum 13-20-C Outflow Spillway Design <br />Addendum 13-20-D Pond 013 Final Geotechnical Report and Summary <br />Addendum 13-20-E Pond 013 Compaction Testing Result <br />• <br />u <br />TR-26 i Revised 09/04 <br />