My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-22_ENFORCEMENT - C1981035
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1981035
>
2009-01-22_ENFORCEMENT - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:43:01 PM
Creation date
1/22/2009 10:53:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
ENFORCEMENT
Doc Date
1/22/2009
Doc Name
Formal Public Hearing GCC Energy Packet
From
Savage & Savage
To
DRMS
Violation No.
CV2008002
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Relevant pages from the approved GCC Energy King Coal Mine permit <br />document, including: <br />o Page iv, Table of Contents: Maps, identifying the map that is the subject <br />of the NOV <br />o Page 1, Section 2.03.8 Permit Term Information, identifying the number <br />of acres of surface lands lying within the approved permit area <br />o Page 4, Section 2.04.6 Geologic Hazards, describing the robustness of the <br />overlying geologic stratigraphy and projected lack of significant effects to <br />the ground surface above workings <br />o Page 7, Section 2.04.7 Hydrology, describing the lack of hydrologic <br />impacts from the mine due to mining measures <br />o Page 1, Section 2.05.3 Operation Plan, Mine Workings, describing that <br />the anticipated workings are depicted on Map King 1-005. <br />o Pages 2-5, Section 2.05.6, Inventory of Structures and Renewable <br />Resource Lands, Worst Possible Consequences of Subsidence, Subsidence <br />Monitoring Program, describing the permit and affected area wide <br />assessment and monitoring of effects from underground mining. <br />Thank you for your consideration, and we look forward to presenting our arguments for <br />dismissal of the NOV in February. <br />Sincerely, <br />C _ <br />4D 4446 <br />Michael S. Savage <br />Principal <br />c: Tom Bird, Trent Peterson, GCC Energy <br />•
The URL can be used to link to this page
Your browser does not support the video tag.