My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-20_PERMIT FILE - X200923100
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
X200923100
>
2009-01-20_PERMIT FILE - X200923100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:42:58 PM
Creation date
1/22/2009 10:08:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
X200923100
IBM Index Class Name
PERMIT FILE
Doc Date
1/20/2009
Doc Name
NOI Application
From
Hydro-Environmental Solutions, Inc
To
DRMS
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
bond calculation estimate as part of the NOI review Sage Creek may choose to file a corporate surety <br />for the least cost estimate. <br />The following sections describe the specific proposed reclamation practices to be used to return areas <br />disturbed by the exploration activities to a stable condition and productive use. <br />Drill Hole or Well Plugging- Sealing and Abandonment: All drillholes will be plugged, sealed, and <br />abandoned unless they are converted into a groundwater monitor well. Deeper drillholes will be <br />plugged with a minimum of 6 cubic yards (about 750 feet) of cement slurry - this is the off-road <br />transport capacity of a cement truck. Shallower drillholes will be plugged with between 3 and 5 <br />cubic yards of cement slurry (as appropriate). The cement slurry will be tremied into the drillhole <br />from the bottom of the hole, up through the target units. This will effectively plug and seal all coal <br />beds and potential groundwater aquifers to prevent vertical groundwater migration and cross- <br />contamination of aquifers. <br />Any remaining open drillhole interval will be filled with other suitable plugging material (plug gel or <br />vendor-specific grout compounds) and/or drill cuttings to within 5 feet of the ground surface and the <br />drillhole will be sealed with a surface plug consisting of at least 5 feet of cement. Information on <br />potential plugging materials, that are generally superior to conventional cement grout, is provided in <br />Appendix E. Surface casing, if used to keep the drillhole open, will be cut-off at or below grade. <br />Reclaimed drillhole locations will be marked with either a steel fence post or a metal survey cap at or <br />below ground level (used where agricultural cropping occurs). All drillhole locations will be <br />accurately surveyed, and distinctly numbered, allowing for future identification. Abandonment <br />reports will be prepared and filed, as required by applicable regulations. When no longer needed, as <br />noted above, the groundwater monitor wells will be plugged, sealed, and abandoned in essentially the <br />same manner, with the stipulation that cement slurry will be used for plugging the entire well interval. <br />Exploration Site Reclamation: Following completion of exploration activities (drilling, sampling, <br />and geophysical logging) for each exploration site, any drillholes not converted to monitoring wells <br />will be plugged, sealed and abandoned, as previously described, and exploration disturbance will be <br />reclaimed. In accordance with Rules 2.02.2(2)(f) and 4.21.4(4), excavations, artificial flat areas, and <br />embankments created during exploration will be returned to their original contour promptly after such <br />features are no longer needed for coal exploration. Site reclamation will follow completion of <br />exploration activities for each site as soon as reasonably practical, recognizing however, that certain <br />reclamation activities may be coordinated to take advantage of equipment and personnel availability. <br />Seeding of reclaimed exploration sites will occur during the first favorable seeding period (typically <br />late fall [preferred], or early spring) following completion of site reclamation. The following <br />summarizes the steps and general sequence for reclamation of exploration disturbance areas: <br />1) On completion of exploration activities at a given site, all trash, debris, and exploration <br />equipment and supplies will be removed from the site. <br />2) Drilling fluids in mud pits will be allowed to dry, or they may be pumped from the mud pit for <br />off-site disposal. Mud pits or excavated trenches will be backfilled with the excavated <br />material and compacted to minimize any settling. Any excess drill cuttings will be spread <br />over the drill pad, and the drill pads regraded to approximate their original configuration and <br />blend with the adjacent terrain. <br />3) Stockpiled or windrowed "A" and "B" horizon material will be redistributed at a uniform <br />thickness over disturbed areas. <br />4) Disturbed areas will be reseeded to stabilize the surface and control erosion using a seed <br />Sage C-k ProJea -1009 NOI <br />9110"9 14
The URL can be used to link to this page
Your browser does not support the video tag.