Laserfiche WebLink
<br />I <br />r, <br />s KIRKI AND CONSTRUCTION L.L.L.P. <br />I P.O. Box 580 • Rye, Colorado 81069 <br />719/489-3385 <br />FAX 719/489-2268 <br />Equal Opportunity Employer <br />January 8, 2009 <br />Mr. Russ Means <br />Division of Minerals and Geology <br />Grand-Junction Field Office <br />101 S. 3`d St., Suite 301 <br />Grand Junction, CO 81501 <br />RE: DeBeque Gravel Pit, File No. M-1981-058 <br />Technical Revision <br />Dear Russ, <br />RECEIVED <br />JAN 13 2009 <br />GRAND JUNCO tUN tL j OFFICE <br />DIVISION OF <br />RECLAMATION. MINING & .SAFETY <br />We are requesting a technical revision for permit No. M-1981-058 to increase disturbed <br />acres from ten point eight (10.8) acres now bonded to twenty-three (23) total acres. The <br />mining area will be dewatered during mining. Topsoil will be stockpiled on the south <br />end of the mining area. The 8 acre field will be used for crusher operation and product <br />a <br />stockpiles. <br />We have purchased water for augmentation for a new pond with a maximum size of eight <br />(8) surface acres. The existing permitted pond is three point six (3.6) surface acres. <br />These two would be a new total of 11.6 acres of exposed water. The additional 8 surface <br />acre pond will require 4..1. shares of Larkin Ditch Stock we purchased from Tom Latham. <br />The pond slopes will, be 3 to 1. or flatter. <br />If you have any questions, please free to contact my office at 719-489-3385. <br />Thanks <br />U <br />Joe C. Baxter <br />Kirkland Construction