Laserfiche WebLink
Sf -S a-1 <br />WATER DIVISION ONE / <br />OFFICE OF THE STATE ENGINEER I <br />Division of Water Resources <br />Department of Natural Resources <br />810 9" Street, Suite 200 <br />Greeley, Colorado 80631 <br />Phone (970) 352-8712 <br />Fax (970) 392-1816 <br />www. water.state. co.us <br />STATE OF COLORADO <br />-?Gsco? <br />Ne:;: <br />* <br />9.?76-M <br />September 7, 2007 <br />Mr. Don Poulter, P.E. / <br />Water Management Consultants <br />1875 Lawrence Street, Suite 500 <br />Denver, CO 80202 / <br />Re: Lining of Bayshore Ponds aka Riverdance Subdivision ? <br />(Previously M-82- ) -' <br />Sections 35 and 36, T3N, R68W <br />Water Division 1, Water District 5 <br />Dear Don: <br />Bill Ritter, Jr <br />Governor <br />Harris D. Sherman <br />Executive Director <br />(Vacant) <br />State Engineer <br />James R. Hall <br />Division Engineer <br />The purpose of this letter is to approve the lining of the above referenced gravel pit. This <br />approval is based on the information provided by you under a cover letter dated February <br />28, 2007 and within an e-mail and spreadsheet sent at 11:09 AM on August 15, 2007. The <br />estimated pit inflows from precipitation and groundwater and outflows due to evaporation <br />indicate that this pit has been lined to the desian standard referenced in the August <br />1999 State Engineer Guidelines for Lining Criteria for Gravel Pits. Meeting the design <br />standard requires that all water inflows and outflows for this pond must be <br />accounted for on a monthly basis. <br />Please call me if you have any questions. <br />Sincerely, <br />David L. Nettles, P.E. <br />Assistant Division Engineer <br />Bayshore_RiverdancePitLineOK.doc <br />CC: Scott Edgar, Water Commissioner <br />Jeff Deatherage, Denver SEO