My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-12-19_REVISION - M1988112 (12)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
2007-12-19_REVISION - M1988112 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:38:58 PM
Creation date
1/21/2009 1:50:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
REVISION
Doc Date
12/19/2007
Doc Name
Submittal
From
TELESTO
To
DRMS
Type & Sequence
AM3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resuunsibilities as a Permitted: <br />-6- <br />Upon application approval and permit issuance, this application becomes a legally binding document. Therefore, there are anumber of <br />important requirements which yott, as a pel,rnittee, should fully understand. These requirements are listed below. Please read turd <br />initial each requirement, in the space provided, to acknowledge that you understand your obligati<ms. If you do not understand these <br />obligations then please contact this Office for a full explanation. <br />411 <br />1. Your obligation to reclaim the site is not limited to the amount of the financial warranty. You assume legal liability for all reasonable <br />expenses which the Board or the Office may incur to reclaim the affected lands associated with your mining operation in the event your <br />permit is revoked and firmucial warranty is forfeited; <br />4W2. The Board may suspend or revoke this permit, or assess a civil penalty, upon a finding that the permittee violated the tcmts or conditions of <br />this permit, the Act, the Mineral Rules and Regulations, or that information contained in the application or your permit misrepresent <br />important material facts; <br />3. Ifyour mining and reclamation operations affect areas beyond the boundaries of an approved permit boundary, substantial civil penalties, <br />to you as pennince can result; <br />e. Any modification to the approved mitring and reclamation plan from those described in your approved application requires you to submit a <br />permit modification and obtain approval from the Board or Office; <br />4W5- It is your responsibility to notify the Office of any changes in your address or phone number; <br />6W. Upon permit issuance and prior to beginning on-site min hig activity, you must post a sign at the entrance of the mine site, which shall be <br />clearly visible front the access road, with the following information (Rule 3.1.12): <br />a, the name of the operator; <br />b, a statement that a reclamation permit for the operation has been issued by the Colorado Mined Land Reclamation Board; and, <br />c, the permit number. <br />/7. The boundaries of the permit boundary area must be marked by monuments or other markers that are clearly visible and adequate to <br />delineate such boundaries prior to site disturbance. <br />41 8. It is a provision of this permit that the operations will be conducted in accordance withthe terns and conditions listed in your application, <br />as well as with the provisions of the Act and the Mineral Rules and Regulations in effect at the time the permit is issued. <br />, 9. Annually, on the anniversary date of permit issuance, you must submit an annual fee ($1,000), and an annual report which includes a map <br />describing the acreage affected and the acreage reclaimed to date (if there are changes from the previous year), any monitoring required by <br />the Reclamation flan to be submitted annually on the anniversary date of the permit approval. Annual fees are for the previous year a <br />permit is held. For example, a permit with die anniversary date of July 1, 1995, the annual fee is for the period ofJuly 1, 1994 through <br />A=30,11995. Failure to submit your annual fee and report by the permit anniversary date may result in a civil penalty, revocation of your <br />permit, and fotfeittwo of your financial warranty. It is your responsibility, as an operator, to continue to pay your annual fee to the Office <br />until the Board releases you from your total reclamation responsibility.
The URL can be used to link to this page
Your browser does not support the video tag.