Laserfiche WebLink
Beginning at a point from which the Quarter Corner between Sections 26 and 27 <br />as monumented by a marked stone recovered in place bears N 89°42'44" W a <br />distance of 4823.02 feet; <br />1. thence N 17°21'04" E along a line 10 feet easterly of and parallel to the <br />west line of Tract 76 of the San Pedro Lands a distance of 2164.32 feet ; <br />2. thence following the arc of a curve to the right (Curve Data: Central Angle <br />= 61°59'49"; Radius = 40.00'; Chord Bearing = N 48°20'59" E; Chord <br />Length = 41.20 feet) a distance of 43.28 feet; <br />3. thence N 79°20'53" E a distance of 247.85 feet; <br />4. thence N 77°41'06" E a distance of 210.29 feet; <br />5. thence N 79°25'45" E a distance of 142.31 feet; <br />6. thence following the arc of a curve to the right (Curve Data: Central Angle <br />= 13°03' 12"; Radius = 845.00'; Chord Bearing = N 85°57'21" E; Chord <br />Length = 192.09 feet) a distance of 192.51 feet; <br />7. thence S 87°31'03" E a distance of 100.96 feet; <br />8. thence S 84°13'06" E a distance of 420.99 feet; <br />9. thence S 85°31'38" E a distance of 483.40 feet; <br />10. thence following the arc of a curve to the left (Curve Data: Central Angle <br />= 24008'57"; Radius = 955.00'; Chord Bearing = N 82°23'53" E; Chord <br />Length = 399.54 feet) a distance of 402.52 feet; <br />11. thence N 02°27'00" W a distance of 46.89 feet to a point on the south line <br />of the existing Battle Mountain Gold Water Line Easement; <br />12. thence following the arc of a curve to the left of said easement boundary <br />(Curve Data: Central Angle = 01°42'36"; Radius = 775.00'; Chord <br />Bearing = N 66°48'49" E; Chord Length = 23.13 feet) a distance of 23.13 <br />feet; <br />13. thence N 65°57'31" E along the south line of said easement a distance of <br />19.75 feet; <br />14. thence S 02°27'00" E a distance of 91.36 feet-, <br />15. thence following the arc of a curve to the right (Curve Data: Central Angle <br />= 25°51' 17"; Radius = 995.00'; Chord Bearing = S 81°32'44" W; Chord <br />Length = 445.19 feet) a distance of 448.99 feet; <br />16. thence N 85°31'38" W a distance of 483.85 feet; <br />17. thence N 84°13'06" W a distance of 420.29 feet; <br />18. thence N 87°31'03" W a distance of 99.81 feet; <br />19. thence following the arc of a curve to the left (Curve Data: Central Angle <br />= 13°03' 12"; Radius = 805.00'; Chord Bearing = S 85°57'21" W; Chord <br />Length = 183.00 feet) a distance of 183.40 feet; <br />20. thence S 79°25'45" W a distance of 141.70 feet; <br />21. thence S 77°41'06" W a distance of 210.26 feet; <br />22. thence S 79°20'53" W a distance of 248.43 feet; <br />23. thence S 17°21'04" W a distance of 2152.04 feet; <br />24. thence N 89°42'44" W a distance of 41.84 feet; <br />to the True Point of Beginning, containing 4.10 acres, more or less. This <br />parcel is subject to any and all existing easements. <br />Battle Mountain Resources, Inc. 8 <br />PVrojects\212-Newmont(S=Lui#SavLuis\Permit Amendment- Wa Pit MemS-t\V5 Report &. PDFAText\PetmitAmend-m_v5c.doc December 2007