My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-14_REVISION - M2006084
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2006084
>
2009-01-14_REVISION - M2006084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:18:27 PM
Creation date
1/21/2009 9:39:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006084
IBM Index Class Name
REVISION
Doc Date
1/14/2009
Doc Name
Adequacy response
From
Greg Lewicki and Associates
To
DRMS
Type & Sequence
AM1
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Table E-1 Reclamation Quantities <br />• <br />• <br /> Area (acres) Material needed to <br />Backfill (yd3) Wetland Footprint <br />(No topsoiling) Topsoil Required for <br />Reclamation of Non- <br />footprint areas (yd3) <br />Phase 1 11.00 110,997 - 17,747 <br />Phase 2 10.90 140,683 - 17,585 <br />Phase 3 11.00 141,973 - 17,747 <br />Phase 4 10.60 102,608 - 17,101 <br />Phase 5 9.50 128,260 1.55 12,826 <br />Phase 6 9.50 2.20 11,777 <br />Phase 7 9.40 1.85 12,181 <br />Total 71.90 624,521 5.60 106,964 <br />Table E-2 Reclamation Land Usage <br />Existing <br />wetlands <br />3.06 <br />Created <br />wetlands 19.45 <br />Lake Surface 46.65 <br />Road 0.39 <br />Rangeland 23.19 <br />Total 92.74 <br />2. Reclamation Timetable <br />The time for reclamation is shown below. Exhibit L: Reclamation Costs describes the worst case <br />bond scenario. <br />White River City Pit, August 08 E-3
The URL can be used to link to this page
Your browser does not support the video tag.