2008-01-03_REVISION - C1981038
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2008-01-03_REVISION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:20:31 PM
Creation date
1/20/2009 2:41:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
REVISION
Doc Date
1/3/2008
Doc Name
Memo and Reclamation Cost Estimate
From
Jim Stark
To
Joe Dudash
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />' Bowie No. 1 Mine C-81-038 <br />Partial Phase I Bond Release SL-03 <br />Applicable Cost Summary Sheet <br />Task: 000 Site: Bowie No. I Mine Date: 15 Nov 07 User: JRS <br />Permit Action: Partial Phase I Bond Release SL-03 County Delta <br />Description:_ Cost Summary File Name: C-1981-038 - <br />Tas Reclamation Task Description Hours _ Direct Cost <br />201 Seal Loadout Wells Not Released $0.00 <br />202 Demolish and Remove Structures at Loadout 500.00 $1,721,161.00 <br />203 Demolish and Remove Structures at Loadout 200.00 $450,274.00 <br />204 Haul Footprints of Loadout Stockpiles to Refuse Area Not Released $0.00 <br />205 Rip Coal Storage/Loadout Area Not Released $0.00 <br />206 Excavation/Grading at Storage Area and L_oado_ut_ Not Released $0.00 <br />207 Grade Railroad Spur Not Released $0.00 <br />208 Finish Grade Railroad Spur Not Released $0.00 <br />209 Replace Topsoil from Stockpile to Truck Dump Station Not Released $0.00 <br />210 Reseed Train Loadout and Coal Stockpile Areas Not Released $0.00 <br />211 Remove Coal Stockpile Pond <br />-- Not Released <br />- - -- - - $0.00 <br />-- - - <br />- - -- <br />212 - - - - --- - <br />- <br />Remove Train Loadout Pond Not Released $0.00 <br />-- - - - - -- - - - - -- - -- - - - - -------..... <br />Total Indirect Costs <br />$2,171,435.00 <br /> Liability Insurance (1.55%) $33,657.24 <br /> Performance Bond (1.05%) $22,800.07 <br /> Profit (10%) $217,143.50 <br /> Job Supenntendant (1500 hours @ $37.50/hour) 700.00 $56,250.00 <br /> Total Contract $2,501,285.81 <br /> Engineering Fees (4.25%) $106,304.65 <br /> Administrative Costs (3.25%) $81,291.79 <br />Total Applicable Loadout <br />Summary Sheet Page 1 of 1