My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-08_REVISION - C1981038
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2008-01-08_REVISION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:20:45 PM
Creation date
1/20/2009 2:40:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
REVISION
Doc Date
1/8/2008
Doc Name
2nd Adequacy Review
From
DRMS
To
J.E. Stover & Associates
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />CIRCES Cost Estimating Software <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task #: 010 . State : Colorado Permit/job #: C-1981-038 <br />Date : 1112012007 County :Delta Abbreviation : none <br />User : JRS Site : Bowie No. 1 Mine Filename : C038-010 <br />Permit or other job action : Partial Phase I Bond Release SL-03 <br />Task description : Haul Fill from Storage Zone 1-B to Portal Zone 4C <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />Truck/loader team -Truck : Cat 773D (2002) <br />-Loader : CAT 990 Series 11(2005) <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />_\A/efor fn A, <br />DIOR - 10SU <br />! D10R - 10SU <br />T 14H <br />Watar Tankar 5 000 Gal. <br />Cost Breakdown : ruck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader dozer dozer grader misctruk <br />% Utilization-machine : 100 98 100 100 50 50 <br />-Ripper attachment : NA NA 0 0 0 NA <br />Ownership cost/hour : $52.49 $105.80 $84.86 $84.86 $39.60 $21.89 <br />Operating cost/hour : <br />Ripper op. cost/hour : $88.21 <br />NA $114.79 <br />NA $138.49 <br />$0.00 $138.49 <br />$0.00 $24.26 <br />$0.00 $17.36 <br />$0.00 <br />Operator cost/hour : <br />Unit subtotals : $21.72 <br />$162.42 $32.96 <br />$253.56 $32.78 <br />$256.13 $32.78 <br />$256.13 $24.47 <br />$88.32 $33.94 <br />$73.19 <br />Number of units : 5 1 1 1 1 1 <br />Group subtotals : Work : $1,065.64 Support: $512.26 Maintenance : $161.52 <br />Material welgnr : z,auu puunus/w r ..•,,.- ........ <br />Descr.: Decomposed rock - 50% Rock, 50% Earth Heaped volume : <br />Rated payload : 108,060 pounds Average volume : <br />Payload capacity: 37.26 LCY Adjusted volume': <br />Final truck volume based on number of loader passes <br />truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Cauacity : goo a.vnaalur <br />Rated capacity (nom. heaped) : 11.250 LCY <br />Descr.: Other- rock/dirt mixtures (100-120%) Altitude adj. <br />Bucket fill factor : 1.100 Job efficiency <br />Adjusted bucket capacity: 12.375 LCY Net correction <br />45.90 LCY <br />39.85 LCY <br />37.26 LCY <br />37.13 LCY <br />•ections : Site altitude (ft.) <br />Truck Loader <br />1.000 1.000 <br />0.830 0.830 <br />0.830 0.830 <br />7,100 <br />Source <br />(Cat HB <br />1 shift/da
The URL can be used to link to this page
Your browser does not support the video tag.