My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-15_REPORT - C1981041 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981041
>
2009-01-15_REPORT - C1981041 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:42:54 PM
Creation date
1/20/2009 2:20:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
REPORT
Doc Date
1/15/2009
Doc Name
2008 Annual Reclamation Report
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Annual Reclamation Report
Email Name
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snowcap Coal Company, Inc. -9- 2008 Annual Reclamation Report <br />29. Roadside South Portal Mine Facilities and Stockpile/Prep Plant Area <br />and Conveyor Tunnel Under 1-70 - The Roadside South Portal Mine <br />Facilities, Stockpile and Prep Plant areas where reclaimed as per <br />approved Permit Revision #3 (PR-3). 13.5 acres were reclaimed during <br />the last two quarters of 2007. These acres include all back filled and <br />graded areas along with buildings and asphalt areas that were approved <br />for retention through PR-3. The east end of the Conveyor Tunnel was <br />backfilled and filled with a 2 foot concrete plug. Due to inclement weather <br />and frozen soils, seeding was postponed until the 1st quarter of 2008. <br />Located in the SW'/ & SE'/ Section 34, Township 10 South, Range 98 <br />West, 6th P.M. <br />Area - 13.5 acres reclaimed <br />9.6 acres backfilled and graded <br />6.4 acres topsoiled <br />Date - December 2007 <br />30. Roadside South Portal Road to Old Upper Diversion Ditch and Water <br />Tank (Light Use Road #1 ) - Portions of Light Use Road #1, as approved <br />by PR-3, was graded to approximate original contours and seeded. <br />Located in the SE1/4 Section 34, Township 10 South, Range 98 West, 6th <br />P.M. <br />Area - 1.9 Acres <br />Date - September 2007 <br />Seed Mix - "Seed Mix, Table 14-8", Upland Components <br />2. Vegetation Studies - Vegetation study was performed by Cedar Creek <br />Associates on June 14 & 15, 2008. Sampling was conducted at the following <br />locations: B Substation; North Decline Mine Dewatering System; Roadside <br />Refuse Borrow Area; Roadside Refuse Disposal Area; Roadside South Portal <br />Upper Diversion Ditch; Cameo Refuse Disposal Areas No.1 and No. 2; Cameo <br />Borrow Areas No. 1 and No. 2; Roadside North Portal; Cameo Refuse Disposal <br />Area Topsoil Piles; South Fan; and 2 West Portals. The Revegetation <br />Evaluation Report has not yet been received by Snowcap, but will be sent to <br />DRMS under separate cover upon receipt. <br />3. Other - None.
The URL can be used to link to this page
Your browser does not support the video tag.