Laserfiche WebLink
C! RQES Cc,st EStirratir C SOfIWVare <br />B;ULLDOZER L`m0,RK <br />PRO.jECT W E_NTIFICATIO^I <br />Task # : 03a State :Colorado- Permit/job# :M_1983-194 _ <br />Date : 0111212009 County: Rio Blanco _ Abbreviation :none- -- <br />-------- - fW- A ---_- Site :Natural Soda, Hoc. Filename :M194-03a <br />User : HM ____- <br />Agency or organization name :DRMS <br />Permit or other job action :Reclamation Cost Estimate for TR-26 <br />Task description :Regrade 6.91 acres of well pad disturbance <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11- 8SU (20011 <br />Horsepower:_ <br />_ 310 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $50.32 NA <br /> <br />E <br />$77.13 100 <br />Operating cost/hour : <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour:---j160.22 Total fleet cost/hour : $320.44 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume:- 16,600 CCY factor : 1.115 volume : 18,509 LCY <br />Source of estimated volume : TR-26 well pad design figure <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : <br />- 150 feet Material consistency : <br />- 1.00 <br />00 <br />1 (Cat HB) <br />en <br />) <br />( <br />Unadjusted hourly production : 634.3 LCY/hr Dozing method : . . <br />g <br />(av <br />) <br /> Visibility : 1.00 g. <br />Material consistency description : Job efficiency : 0.83 <br />80 <br />0 (1shift1day) <br />(fnd-rf) <br />Consolidated stockpile Spoil pile : . <br />11 <br />1 (Cat HB) <br /> Push gradient : . <br />Average push gradient : 5.00 % (neg) Altitude : 1.00 <br />82 <br />0 (Cat HB) <br />(Cat HB) <br />Average site altitude : 6,600 feet Material weight : . <br />00 <br />1 (S/SU/U) <br /> Blade type : . <br />Material weight : 2,800 Ibs/LCY Net correction : 0.46 <br />Weight description <br />Adjusted unit production : <br />289.31 <br />LCY/hr <br />Clay - Natural bed Adjusted fleet production : 578.63 LCY/hr <br />JOB TIME AND COST <br />i <br />2 Dozers) Total job time : <br />31.99 <br />Hours <br />ze : <br />Fleet s <br />Unit cost : $0.554 /LCY Total job cost : $10,250