My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-09_REPORT - M2007044
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2007044
>
2009-01-09_REPORT - M2007044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:43 PM
Creation date
1/16/2009 8:05:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
REPORT
Doc Date
1/9/2009
Doc Name
As built site report
From
Energy Fuels Resources Corp.
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 Q Topsoil Stripping <br />All topsoil was adequately stripped from the disturbed area for the pond, the ditches, the <br />previously reclaimed outslope of the mine bench and the new waste embankment area. Topsoil <br />was stripped to a depth range of 12 inches to 18 inches. Prior to stripping, the vegetation was <br />grubbed from the site. <br />D) Fill and Topsoil Stockpiles <br />The revised pond layout and constraints imposed by the leach field required minor changes to the <br />fill stockpile. As shown on the As Built Map, there are two small stockpiles instead of two larger <br />ones. Both of these stockpiles drain to the sediment pond, so no changes to the ditch collection <br />system are needed for this work. Slopes are less than 2H:1 V. <br />Two topsoil stockpiles were also created. Each has slopes which are less than 3H:1 V and each <br />pile is no higher than 10.0 feet from original ground level. One stockpile is located in the <br />northeast corner of the permit area, as planned, which contains the topsoil from the initial <br />stripping of the waste embankment area. The other stockpile is located immediately west of the <br />sediment pond, and contains topsoil from the stripping of the pond area, the fill stockpile area and <br />a portion of the waste embankment area. This topsoil stockpile was created since it is a much <br />shorter haul distance from where the topsoil was stripped and where it will later be placed. It does <br />not change the affected area or the disturbed area that drains to the pond. <br />Each topsoil stockpile has sediment control based on a ditch and berm that extends around the <br />perimeter of the pile and at the low point of each ditch, a sump has been placed to trap all runoff <br />from the stockpile itself. Each sump was constructed to contain the runoff from the pile itself for <br />the 10 year 24 hour event. The ditches are at least 1.0 feet deep and sidelopes of 2H:1V. <br />Each topsoil stockpile was seeded and mulched according to the permit in December of 2008. <br />• <br />Whirlwind Portal Area As Built Report 6
The URL can be used to link to this page
Your browser does not support the video tag.