Laserfiche WebLink
REVISED 100 Yr POND-F Type 1124-hr 900 FULL YEAR Rainfall=2.90" <br />Prepared by Greg Lewicki & Associates Printed 11/4/2008 <br />HydroCAD® 8.50 s/n 004412 @2007 HydroCAD Software Solutions LLC Page 17 <br />Summary for Link GHI: IMPORTED FLOW FROM MINING GHI FILE <br />Inflow Area = 11.710 ac, 0.00% Impervious, Inflow Depth = 1.98" for 100 FULL YEAR event <br />Inflow = 21.88 cfs @ 12.01 hrs, Volume= 1.930 of <br />Primary = 21.88 cfs @ 12.01 hrs, Volume= 1.930 af, Atten= 0%, Lag= 0.0 min <br />Primary outflow = Inflow, Time Span= 0.00-100.00 hrs, dt= 0.05 hrs <br />100 FULL YEAR Primary Outflow Imported from PHASE 3 POND-BASINS-G-H-I-Link GHI..hce <br />Link GHI: IMPORTED FLOW FROM MINING GHI FILE <br />Hydrograph <br />is <br />24' - - - - --- - - - - - - ------------- <br />23. 21.88 cfs <br />22. <br />21 . Inflow Area=11.710 ac <br />20 ------------- -----------100 FULL-YEAR Primary Outflow, <br />19= <br />18: Imported f(om <br />e <br />t7 -- -- - - PHASE 3POND-BASINS-G-H-1-L_i _ nkG _ HI., _ hc _ _ <br />- - - - - - _. - - - - - - - J ------- .-1 .. .. _ .. - _. _ .. - - - _ _ _ _ _ Area_ 11.710 ac <br />15- <br />14- <br />13: <br />13-: <br />12- <br />9 _ _ _ _ '. .. .. -- _ ------- - <br />8_ - - - - - - -- ------------ - <br />7- <br />6- <br />4- <br />3- <br />2. <br />0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 10C <br />w <br />3 <br />0 <br />LL <br />Time (hours) <br />Inflow <br />Primary • <br />