My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-13_PERMIT FILE - M2008070 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008070
>
2009-01-13_PERMIT FILE - M2008070 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:53 PM
Creation date
1/16/2009 8:05:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008070
IBM Index Class Name
PERMIT FILE
Doc Date
1/13/2009
Doc Name
Final reclamation liability estimate
From
DRMS
To
JSC, Inc.
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cast Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 0 2 <br />Agency or organization name :DRMS <br />Task 12a State :Colorado Permit/job # :M-2008-070 <br />Date : 0111312009 County: Rio Blanco Abbreviation :none <br />User : GRM Site :Wrc Gravel Pit _ Filename :M070-12a <br />Permit or other job action :Final Reclamation Liability Estimate <br />Task description :secondary reclamation mobilization <br />EQUIPMENT TRANSPORT RIG COST <br />Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tra ctor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />cities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : /hour : $16.63 $18.37 $22.33 <br />/hour : <br />i9 $44.38 <br />F $46.13 $50.07 <br />/hour : $27.66 $27.66 <br />/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NUN-KUAUAt3Lt MAUirmu <br /> <br />Machine <br />Description v <br />Weight/unit <br /> <br />(Tons) <br />Ownership <br /> <br />Cost/hr/unit <br />Haul Rig <br /> <br />Cost/hr/unit <br />Fleet Size <br /> <br />(No. units) <br />Haul Trip <br /> <br />Cost/hr/fleet <br />7 <br />Return Trip <br /> <br />Cost/hr/fleet <br />67 <br />$88 <br />DOT permit <br /> <br />Cost/fleet <br />00 <br />$0 <br />-reveg equipment 10.00 $25.00 $88.67 1 $113.6 . . <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> 67 <br />$88 00 <br />$0 <br /> Subtotals : $113.67 . .
The URL can be used to link to this page
Your browser does not support the video tag.