My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-13_PERMIT FILE - M2008070 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008070
>
2009-01-13_PERMIT FILE - M2008070 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:53 PM
Creation date
1/16/2009 8:05:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008070
IBM Index Class Name
PERMIT FILE
Doc Date
1/13/2009
Doc Name
Final reclamation liability estimate
From
DRMS
To
JSC, Inc.
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estilllating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organi <br />Task Ila <br />Date : 01_11312009 <br />User : GRM <br />................ . . <br />sheet 1 0 2 <br />zation name :DRMS ---._-.-- <br />State :Colorado Permit/job # : M-2008-070 <br />County :Rio Blanco Abbreviation :none _ <br />Site :Wrc Gravel Pit Filename :M070-11a <br />Permit or other job action :Final Reclamation Liability Estimate <br />Task description :Initial mobilization to site <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />IYVIY-RVp1y/1uLV wwu n <br />Machine <br />Description <br />-reveg equipment <br />-Cat D8R Series // - 8U (200 <br />-Water Tanker, 7,000 Gal. •. <br />Weight/unit <br />(Tons) <br />10.00 <br />53.17 <br />29.65 <br />Ownership <br />Cost/hr/unit <br />$25.00 <br />$50.59 <br />$34.77 <br />Haul Rig <br />Cost/hr/unit <br />$88.67 <br />$125.45 <br />$117.55 <br />Fleet Size <br />(No. units) <br />1 <br />2 <br />1 <br />Haul Trip <br />Cost/hr/fleet <br />$113.67 <br />$352.08 <br />$152.32 <br />Return Trip <br />Cost/hr/fleet <br />$ <br />$2550.9 0.90 <br />$117.55 <br />DOT permit <br />Cost/fleet <br />$0.00 <br />$0.00 <br />$0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals <br />: $618.07 <br />$457.12 <br />.00 <br />$0
The URL can be used to link to this page
Your browser does not support the video tag.