My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-13_PERMIT FILE - M2008070 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2008070
>
2009-01-13_PERMIT FILE - M2008070 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:39:53 PM
Creation date
1/16/2009 8:05:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008070
IBM Index Class Name
PERMIT FILE
Doc Date
1/13/2009
Doc Name
Final reclamation liability estimate
From
DRMS
To
JSC, Inc.
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRC1= ` SiOSt.r_st(i?lai:r?Cj_'ZOTtS'Varv <br />BULi_DOZER 4'IJORK <br />PROJECT IDENTIFICATION <br />Task #: 09a State :Colorado Permit/job# :M-2008-070 <br />Date 0111312009 County: Rio Bianco Abbreviation :none--- <br />User: GRM Site :Wrc Gravel Pit Filename :M070-09a <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $57.40 NA <br /> Operating cost/hour : $77.43 100 <br /> Ripper op. cost/hour : $1.68 25 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $169.28 Total fleet cost/hour : $169.28 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 11,858 LCY factor : NA volume : 11,858 LCY <br /> <br />Source of estimated volume 14.7 acres X 43560127 X. 5 (6 in topsoil) <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production :- -615.8 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Partly consolidated stockpile Spoil pile : 0.80 (fnd-ro <br /> Push gradient : 1.60 (Cat HB) <br />Average push gradient : 29.70 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,875 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 lbs/LCY Net correction : 0.79 <br /> <br />Weight description <br />Earth - Dry packed Adjusted unit production : 406.71 LCY/hr <br /> Adjusted fleet production : 406.71 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 29.16 Hours <br />Unit cost : $0.416 /LCY Total job cost : $4,936 <br />
The URL can be used to link to this page
Your browser does not support the video tag.