Laserfiche WebLink
<br />STRUCTURAL FILLS/SOILS NUCLEAR DENSITY TEST RESULTS <br /> <br /> <br />Test <br />Pond 14 Construction <br />RISER PIPE CONSTRUSTION & INSTALLATION <br />Depth <br />or Max. <br />Dry <br />Density Opt. <br />Moisture <br />Content <br />Dry <br />Density <br />M1toist. <br />Cont. <br /> <br />Cam action <br />No. Location Elev. (pcf) (%) (pcf) (%) Act.(%) Req. (%) Proctor Number and Sod Description <br />39 Top of Dam @ Grade Elev., E. Side Above Riser Pipe 8 in 111.0 110.6 14.1 99.7 95.0 Passed <br /> <br />40 Top of Dam @ Grade Elev., W. Side Above Riser Pipe 8 in. 111.0 106.9 15.4 96.3 95.0 Passed <br /> <br />41 Top of Dam @ Grade Elev., Middle of Dam Above Riser Pipe 8 in. 111.0 106.5 15.3 96.0 95.0 Passed <br /> <br />42 lop of Dam @ Grade Elev., 20ft. North Of Test No.39 B In. 111.0 109.4 14.6 98.6 95.0 Passed <br /> <br />43 Top of Dam @ Grade Elev., 11ft. North of Test No.40 8 in. 111.0 109.9 15.4 99.0 95.0 Passed <br /> <br /> <br /> <br /> <br /> <br />Proctor No. 1 Data <br />Max. Dry Density (pcE]: <br />Opt. Moisture Content(%): <br />Proctor No. 2 Data <br />Max. Dry Density (pcf): <br />Opt. Moisture Coment(%): <br />Gauge Data <br />Gauge No.: 3440 S.S#022819 <br />Gauge Correction Factor:_ <br />Soil <br />Soil <br />Density Standazd Count: 2499, -0.0% Pass <br />Moisture Standazd CounnG08, 0.7°/ Pass <br />Pro ect Name: Seneca Coal -Pond 14 Construction <br />Pro ect Location: Ha den, Colorado <br />Arojec[ Number 2470] OB Technician: Matt Mathison Date: 18, September 2001 <br />C7 <br />MONTGOMERY WATSON <br />Pond f 1 Nutlsar OBnsey rests <br />