My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-13_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2009-01-13_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:20 PM
Creation date
1/15/2009 10:45:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
1/13/2009
Doc Name
FW Analysis for Blasting of Highwalls not to Final Design Configuration.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
warranty for the Cresson Project as approved under Amendment No. 9. These additional funds <br />would more than offset any costs associated with blasting the approximate 8,100 linear feet of <br />highwall not to final design configuration. <br />In addition, worst case highwall blasting liability would be covered by excess financial warranty <br />amount until approximately 100 days prior to completion of Cresson Project (see Attachment #1, <br />page 1). CC&V Engineering Department assures that linear feet of highwall not to final design <br />configuration would be significantly reduced during the final year of the project as mining <br />activities would be occurring only in one mining area. <br />The documents submitted herein do not affect the financial warranty as approved under <br />Amendment No. 9, but is meant to demonstrate that there is more than adequate excess financial <br />warranty in place to cover even the worst-case highwall configuration. <br />If you have any questions or require further information, please contact me at your convenience <br />at (719) 689-4055. <br />Sincerely, <br />/ "Pt'W. <br />Timm Comer <br />Chief Environmental Coordinator <br />cc: Gary Goodrich, CC&V <br />Jeff Campbell, CC&V <br />Enclosed: Attachment #1, 2 pages
The URL can be used to link to this page
Your browser does not support the video tag.