Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />003 State :Colorado Permit/job # :M-1995-030 <br />0110912009 County :Morgan Abbreviation :none <br />MAC Site : Green Bros. Pit #2 Filename : M030-003 <br />Permit or other job action :Succession Of Operator Bond Calculation <br />Task description : Replacinm TODSO/l <br />HOURLY EQUIPMENT COST <br />uipment Description <br />Cost Bre <br />Shift basis : 1 per day <br />Scraper work team -Scraper : Cat 621G <br />-Push dozer: Cat D8R Series ll - 8U(2005) <br />Support equipment -Load area :NA <br />-Dump area :NA <br />Road maintenance -Motor grader :NA <br />-Water truck :I NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 dozer NA NA NA NA <br />% Utilization-machine : 100 39 NA NA NA NA <br />_Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $50.48 $50.59 NA NA NA NA <br />Operating cost/hour : $85.90 $29.82 NA NA NA NA <br />Ripper op. cost/hour : NA $0.00 NA NA NA NA <br />Operator cost/hour : $24.95 $32.78 NA NA NA NA <br />Unit subtotals : $161.33 $113.19 NA NA NA NA <br />Number of units : 1 1 0 0 0 0 <br />Group subtotals : Work : $274.52 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $274.52 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,640 CCY factor : 1.215 volume : 1,993 LCY <br />Source of quantity take-off :Previous bond calculation <br />Source of estimated swell factor : Program