Laserfiche WebLink
It <br />Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />December 2008 Monthly Report <br />Page 3 <br />Table 2 -December 2008 Tailing Disposal Area Piezometer Depth to Water <br />Measurements (continued) <br />Piezometer Date Depth to Water <br />feet Total Depth (ft) Volume of <br />Water ft <br />P12 12/30/08 D 41.71 0.60 <br />P13 12/30/08 40.97 41.34 0.37 <br />P14 12/30/08 Dry 1 41.24 0.00 <br />P15 12/30/08 Dry 1 41.10 0.00 771 <br />Table 3 below provides the calendar year 2008 sludge management for the San Luis site. <br />Table 3 - Water Treatment Plant Sludge Management Year to Date. <br />Date Quantity Sludge Management <br />June 2008 120 tons Sludge transferred from drying pad to tailing <br />impoundment. <br />Should you have any questions or comments, please do not hesitate to contact either myself (719) <br />ili -0 798 or Mr. Bill L le (303) 324-2630. <br />reo F. Madrid <br />Environmental Coordinator III <br />Cc: Bill Lyle <br />File