Laserfiche WebLink
Blade type : Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2:3-shank ripper <br /> Data source: (CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $58.24 NA <br /> Operating cost/hour : $73.75 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cost/hour : $164.77 Total fleet cost/hour : $164.77 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 370 CCY factor : 1.125 volume : 416 LCY <br /> <br />Source of estimated volume: 1990 Reclamation Cost Estimate <br />Source of estimated swell factor : CAT Handbook <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 852.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-M <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,400 feet Material weight : 0.87 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,650 Ibs/LCY Net correction : 0.39 <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth <br />............................... <br />JOB TIME AND COST <br />Adjusted unit production : 331.54 LCY/hr <br />Adjusted fleet production : 331.54 LCY/hr <br />Fleet size : 1 Dozer(s) Total job time : 1.26 Hours <br />Unit cost : $0.497 /LCY Total job cost : $207