My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-09-21_REVISION - C1981047
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981047
>
2007-09-21_REVISION - C1981047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:57 PM
Creation date
1/13/2009 10:37:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
REVISION
Doc Date
9/21/2007
Doc Name
Adequacy Review
From
DRMS
To
J.E. Stover & Associates
Type & Sequence
RN5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />September 21, 2007 <br />Jim Stover, P.E. <br />J. E. Stover & Associates <br />P.O. Box 60340 <br />Grand Junction, CO 81506 <br /> <br />RE: Blue Ribbon Mine, Permit No. C-81-047, Minrec, Inc. <br />Permit Renewal No. 5, Reclamation Cost Estimate Adequacy Review <br />Dear Mr. Stover: <br />COLORADO <br />D I V IS I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />Bill Ritter, Jr. <br />Governor <br />Harris D. Sherman <br />Executive Director <br />Ronald W. Cattany <br />Division Director <br />Natural Resource Trustee <br />The Colorado Division of Reclamation, Mining and Safety (Division) has finished its adequacy review of <br />the reclamation cost estimate for Permit Renewal No. 5 for the Blue Ribbon Mine. Attached are the cost <br />estimate worksheets. The worksheets are comprised of one summary sheet and worksheets for tasks nos. <br />001, 002, 005 through 008, 010, 014, 015, 016 and 020. <br />The Blue Ribbon Mine's new liability of $42,065.00 is $3,249.00 more than the previous liability <br />calculated with the 2005 Midterm review, which was $38,816.00. The current liability in the Division's <br />permit system is $46,257.00. This liability has been statutorily set by the bond release process and may not <br />be decreased. The Division currently holds a certificate of deposit in the amount of $48,000.00, which is <br />more than the current calculated liability and more than the statutory liability set through the bond release <br />process. The Blue Ribbon Mine does not need to submit any additional bond monies at this time. <br />Please review the Division's reclamation cost estimate and inform the Division in writing whether or not <br />the cost estimate is acceptable to Minrec. <br />If you have any questions, please call me. <br />Sincerely, <br />tJseph J. D ash <br />Environmental Protection Specialist <br />Attachments <br />c:\word\blueribbon\m05adeg2 <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.