Laserfiche WebLink
- acre-feet or less. Additionally, the biological opinion stated that sufficient progress has been <br />achieved such that small historic depletions do not require implementation of items in the <br />Recovery Action Plan in order for the projects to proceed. Therefore, no further consultation is <br />required. <br />The determination in this document is based on the information provided by the Office of <br />Surface Mining, Reclamation, and Enforcement. If new information becomes available, if a new <br />species becomes listed, if incidental take occurs, if the total average annual amount of water <br />depleted by this project changes, or if any other project element changes which alters the <br />operation of the project from that which is described in your correspondence and which may <br />affect any endangered or threatened species in a manner or to an extent not considered in this <br />biological opinion (see 50 CFR 402.16), formal section 7 consultation should be reinitiated. The <br />Office of Surface Mining, Reclamation, and Enforcement should condition its approval <br />documents to retain jurisdiction should section 7 consultation need to be reinitiated. <br />cc: CDOW, Grand Junction <br />TIreland:OSMMinrec'sBlueRibbonMine2-SedimentPondsFSBO. doc:121907 <br /> <br />2