Laserfiche WebLink
Project: <br />................... <br />.................... ................... <br />GE0TECH ' <br />.. <br />.:::: <br />...::::: <br />Client / On Site Rep: <br />Bowie Resources / B. Bear <br /> <br />Bowie Mine Gob Pile Stability ...... <br />..... <br />................................... <br />? ? <br />Civil, Structural & Geotechnical Engineers <br />- Montrose <br />CO 81401 <br />222 Souih Park Ave <br />Contractor /Rep: <br />Load Out Services / Ty Hyatt <br />Project No: <br />2005126-CMT Date: <br />12/3/2008 , <br />. <br />Ph.: (970) 249.6828 - FAX: (970) 249-0945 <br />CONSTRUCTION MATERIALS TESTING LABORATORY Technician: <br />L. Sanchez <br /> DAILY CO MPACTION REPORT <br /> TEST TYPE MAX DRY OPTIMUM DRY MOISTURE PERCENT NOT SOIL LAB SAMPLE <br />TEST <br />NUMBER LOCATION <br />Embankment Fill - Gob Pile No. 4 GRADE ELEV NUC SAND DENSITY <br />(pcf) MOISTURE <br />CONT. (%) DENSITY <br />(pcf) CONTENT <br />(%) COMPACTION WITHIN <br />SPEC TYPE NUMBER <br />214A Retest of test No. 214 6091.66 X 81.1 11.9 78.4 9.1 96.7 gob #214 r/c 024% <br />221 (PT#4351) N 19540.48/E37887.00 6100.26 X 104.8 8.0 94.0 10.2 90.0 gob #4230 & *4231 r/c oqs% <br /> <br /> Embankment Fill - Gob Pile No. 1 <br />215A Retest of test No. 215 6209.2 X 86.8 10.2 80.2 9.8 92.3 ob 0213r/<@28% <br />216A Retest of test No. 216 6215.0 X 86.0 11.2 79.5 10.9 92.4 gob #z13 roc 019% <br />219A Retest of test No. 219 6209.7 X 79.8 11.8 75.4 13.4 94.4 gob #217 r/c 038% <br />220A Retest of test No. 220 6216.07 X 79.5 11.2 76.3 12.6 95.9 gob 9217 roc 025% <br /> <br /> <br /> <br />MOISTURE / DENSITY SPECIFICATIONS OBSERVATION / TESTING FIELD OBSERVATIONS <br />Specified Date: Compaction Equipment Used: <br />Compaction 90%+ Cohesive Soils X <br />Requirement: Cohesionless Soils Full Time: 0 Day: <br />5 M T W <br />X Th F 5 <br />Sheepsfoot: A <br /> Part Time: Q Weather: Sun Clear Overcast Rain Snow <br />ecified <br />S x X Smooth Drum Roller: <br />p <br />Moisture N/A Cohesive Soils X <br />Requirement: Cohesionless Soils Number of Site Visit/Day: Temp: To 32 <br />x 32-50 <br />X 50-70 70-85 85 Up <br />Vibratory: <br /> Testing Only: Wind: Still Mod High <br />77-1 <br /> Requested By (Company Name): X Other (List Below): <br />Laboratory Testing ASf.M-698 Cohesive Soils X <br />Procedure: <br />Cohesionless Soils Ty Hyatt / Load Out Services Humidity: Dry <br /> <br />X Mod Humid Haul Traffic <br />DENSITY / COMPACTION TESTING WAS NOT PERFORMED <br />ON THIS DATE FOR THE FOLLOWING REASONS: Insufficient amount <br />lof material placed. Informed (Rep of Company) of Test Results: <br />Ty Hyatt /Load Out Services <br />Burn was not informed prior <br />to o ou our arrival on site that the <br />Contractor Not Working Due To: The Contractor Is: contractor would not be working <br /> <br />Inclement Weather: <br /> <br />Equipment Malfunction: <br />Processing Frozen Material: =Processing Wet Material: <br /> <br />Stripping and/or Grubbing: Moisture Conditiomtng Dry Mat'!, Field Copies Given To: <br /> <br />Contractor: <br />Client: on this date. <br /> <br />Unknown: <br />Stockpiling Fill: =Removing Unsuitable Mafl: E:? CM/GM: <br />Other: PAGE 1 OF 1 <br />05-126-CMT Bowie Mine Gob Pile Stability.As DCR12-3-081s#214A-ap