My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-09_REVISION - M2003003
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2003003
>
2009-01-09_REVISION - M2003003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:48:21 PM
Creation date
1/13/2009 9:36:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003003
IBM Index Class Name
REVISION
Doc Date
1/9/2009
Doc Name
Approval & notice of bond increase
From
DRMS
To
Consolidated Constructors, Inc.
Type & Sequence
TR1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br /> WHEEL LOADER - LOAD AND CARRY WORK <br />PROJECT IDENTIFICATION <br />Task #: 006 State : Colorado Permittjob #: M-2003-003 <br />Date : 0110912009 County: La Plata Abbreviation : none <br />User : RCO Site : Amzak Pit Filename : M003-006 <br /> <br />Agency or organization name : DRMS <br />Permit or other job action : TR-1 New phases <br />Task description : Remove sediment control berms from bench <br /> <br />HOURLY EQUIPMENT COST Basic machine : CAT 928G Horsepower : 125 <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $15.75 NA <br /> Operating cost/hour : '$23.61 100 <br /> Operator cost/hour : $32.78 NA <br /> Total unit cosbhour : $72.14 Total fleet cost/hour : $72.14 <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume : 500 CCY factor : 1.165 volume : 582 LCY <br />Source of quantity take-off : TR-1 map <br />Source of estimated swell factor : na <br />HOURLY PRODUCTION (CatHB) <br />Loader Cycle Time Unadjusted basic cycle time (load, dump, maneuver) : 0.500 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material : Material 314" to 6" diameter 0.000 (Cat HB) <br />Stockpile : No adjustment - factor not applicable 0.000 (Cat HB) <br />Truck ownership : No adjustment - factor not applicable 0.000 (Cat HB) <br />Operation : No adjustment - factor not applicable 0.000 (Cat HB) <br />Dump target : ,No adjustment - factor not applicable 0.000 (Cat HB) <br />Net cycle time adjustment <br />Adjusted basic cycle time <br />Rolling Resistance - Road Conditions <br />Haul : Rutted dirt, little maintenance, no water, 2" tire penetration <br />Return : Rutted dirt, little maintenance, no water, 2" tire penetration <br />Haul and Return Time Length <br />(feet) Grade res. <br />(%) Rolling res. <br />(%) Total res. <br />(%) Travel time <br />(minutes) Data <br />Source <br />Haul route : 20 0.00 5.00 5.00 0.0141 (Cat HB) <br />Return route : 20 0.00 5.00 5.00 0.0141 (Cat HB) <br /> Total travel time : 0.0282 minutes <br />Loader Bucket Capacity Total cycle time : 0.528 minutes <br />Rated capacity: 2.50 LCY (heaped) (Cat HB) <br />Bucket fill factor : 0.975 Loose material - mixed moist aggregates (95-100%) <br />Adjusted capacity: 2.44 LCY <br /> Source <br />Job Condition Correction Factors Altitude adjustment factor : 1.00 (Cat HB) <br />Site altitude : 7,100 feet Job efficiency factor : 0.83 (1 shift/day) <br /> Net correction : 0.83 multiplier <br />Unadjusted hourly unit production : 276.88 LCY/Hr <br />Adjusted hourly unit production : 229.81 LCY/Hr (Cat HB) <br />Adjusted hourly fleet production : 229.81 LCY/Hr <br />JOB TIME AND COST <br />Fleet size : 1 Loader(s) Total job time : 2.53 Hours <br />Unit cost : $0.314 /LCY Total job cost : $183 <br />0.000 minutes <br />0.500 minutes
The URL can be used to link to this page
Your browser does not support the video tag.