My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-01-09_REVISION - M2003003
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2003003
>
2009-01-09_REVISION - M2003003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:48:21 PM
Creation date
1/13/2009 9:36:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2003003
IBM Index Class Name
REVISION
Doc Date
1/9/2009
Doc Name
Approval & notice of bond increase
From
DRMS
To
Consolidated Constructors, Inc.
Type & Sequence
TR1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />PROJECT IDENTIFICATION <br />Task # : 008 State : Colorado Permit/job # : M-2003-003 <br />Date : 0110912009 County : La Plata Abbreviation :none <br />User : RCO Site :Amzak Gravel Pit Filename : M003-008 <br />Agency or organization name : DBMS <br />Permit or other job action : TR-1 New phases <br />Task description : Rip to remove compaction on road, scale and processing areas <br /> <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis:. 1 per day <br />Attachment no. 2:3-shank ripper <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $70.58 NA <br />Dozer operating cost/hour : $103.27 100 <br />Ripper operating cost/hour : $7.52 100 <br />Operator cost/hour : $32.78 NA <br />Total unit cost/hour : $214.14 Total fleet cost/hour : $214.14 <br /> <br />MATERIAL QUANTITIES <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA <br />Area : 5.00 <br />NA <br />acres <br />Load factor : NA Bank volume <br />Rip depth (ft) : 1.50 Volume <br />NA <br />12,100 <br />BCY <br />BCY or CCY <br />Source of estimated quantity : TR-1 map <br />Source of estimated load factor : NA <br /> <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity : NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 1,397.43 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 1.00 feet/pass Site altitude : 7,100 feet <br />Average ripping width : 7.67 feet/pass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 300.00 feet/pass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feet/minute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.866 acres/hour Adjusted unit production : 1,159.87 cu. yds./hour <br />Unadjusted production : 1,397.43 cu. yds./hour Adjusted fleet production : 1,159.87 cu. yds./hour <br /> <br />JOB TIME AND COST <br />Fleet size : 1 dozer(s) Total job time : 10.43 hours <br />Unit cost : $0.185 per cu. yd. Total job cost : $2,234 <br />
The URL can be used to link to this page
Your browser does not support the video tag.