My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1981018 (18)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981018
>
_INSPECTION - C1981018 (18)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2020 12:23:53 PM
Creation date
1/12/2009 9:53:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
Inspection Date
12/30/2008
Email Name
JDM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. COMMENTS- COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made <br /> during the inspection. Comments also describe any enforcement actions taken during the inspection <br /> and the facts or evidence supporting the enforcement action. <br /> This was a partial coal inspection conducted by Jason Musick of the Colorado Division of <br /> Reclamation, Mining, and Safety(Division)on 30 December 2008. The weather was cloudy and the <br /> mine site was wet with snow cover throughout the mine site during the on-the-ground inspection. <br /> Scott Wanstedt of BME accompanied the inspection. <br /> The mine is currently operating as permitted. Mining activities were not being conducted due to the <br /> holidays. <br /> Roads <br /> The access road to the facilities area appeared to be well maintained with no problems noted. The <br /> haul road was wet; it appeared stable with no signs of erosion or damage. The conveyor corridor <br /> road, access roads and light-use roads were wet with patches of snow cover and appeared to be in <br /> good condition with no problems noted. All roadside ditches and diversions were snow covered at the <br /> time of the inspection. <br /> Hydrologic Balance <br /> The permanent pipe repair for the riser pipe at DP-1 is in progress with the installation of a walkway to <br /> the riser and trash guard still needing to be installed. DP-1 contained a small amount of water at the <br /> time of the inspection. The pond embankment appeared stable with no problems noted. The newly <br /> repaired primary spillway and the secondary spillway appeared to be in compliance with no problems <br /> noted. No discharge was noted for PP-1 and PP-2. No problems were noted. <br /> Processing Waste <br /> Refuse Pile - 2/3/4 appeared to be well compacted and stable. Refuse Pile—5 appeared to be well <br /> compacted and stable and has started to receive stockpiled refuse. No problems were noted. <br /> Overall, the Deserado Mine is in good condition and appears to be conducting operations as required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.