Laserfiche WebLink
Dudash <br />Page 3 <br />January 7, 2009 <br />8. On an ongoing basis the metered discharge volume from the B-Seam workings and the <br />associated water quality data should be reported in upcoming Annual Hydrology Reports. <br />9. The table on page 2.050-70 needs to be updated with a footnote for "H". Please revise the <br />table accordingly. <br />C: Project File <br />Sandy Brown