Laserfiche WebLink
's <br />Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year z 0118 <br />7erro,., &.,L&, Laclou-4-- c - ) 9*?- os9 <br />mine name <br />Address: <br />40to1 <br /> <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br /> <br />Land Status Category Last Years <br />Cumulative Total This Calendar <br />Year <br />Cumulative Total' <br />Acres disturbed j 3 + 0 / 3 <br />Acres backfilled and graded a + o = b <br />Acres to soiled 0 + G = U <br />Seeding typically begins the minimum 10-year reclamation liability period. Please report the acres for <br />each cateaorv below. Do not include acres that have achieved final. Phase III release. <br /> Last Years This Greater <br /> Cumulative Calendar Cumulative 10 years or than 10 <br /> Total year Total' less ears' <br />Acres seeded* U + b = 0 = 0 + 6 <br />*include, if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed / -5 and the total number of acres: <br />Phase I released d Phase II released y Phase III released -0 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed ®V <br />For Government Performance and Results Act <br />Acreage in long-term mining or reclamation facilities z /3 <br />Acreage in active mining areas 3. <br />1(exclude acres where Phase III release has been achieved) <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; nonbackfilled and <br />graded areas of refuse piles, coal mine waste impoundments, head-of-hollow fills, and valley fills; ventilation shafts and entryways; <br />and noncoal waste disposal area (garbage dumps and coal combustion by-products disposal areas). <br />permit # <br />-C7 <br />-Few., Our <br />Permittee <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded