Laserfiche WebLink
McClane Canyon Mining LLC <br />Water Sampling Report <br />Date: 12/7/08 <br />Weather Conditions: Clear, 95 degrees F. <br /> Surface Water <br />Sample <br />Point <br />Time Flow <br />cfs) <br />pH EC <br />umhos/cm <br />Temp (C) <br />SW-1 12:27 PM 1.00 8.4 4400 2.2 <br />SW-2 12:35 PM Dry - - - <br />SW-3 11:50 AM Dry - - - <br />SW-4 1:04 PM Dry - - - <br />SW-5 12:38 PM Dry - - - <br />SW-6 11:55 AM Dry - - - <br />SW-7 11:55 AM Dry - - - <br />SW-8 11:36 AM 1.00 8.5 4500 1.9 <br />I I <br /> Ground Water <br />Sample <br />Point <br />Time SWL <br />feet <br />pH EC <br />umhos/cm <br />Temp (C) <br />GW-1 12:14 PM 12.2 7.5 7700 11.8 <br />GW-3 11:45 AM 37.2 7.1 4800 12.5 <br />GW-6 11:52 AM Dry-18.8' <br />GW-9 12:50 PM 26.2. 7.2 10450 13.8 <br />Fourth Quarter 2008 <br />Sampled by: Jim Stover <br />Meters Calibrated: Yes <br />Location of Points/Wells <br />SW-1 East Salt Creek above McClane under haul road bridge <br />SW-2 McClane Creek at culvert below mine <br />SW-3 Munger Creek at haul road culvert below mine <br />SW-4 East Salt Creek -2 miles downstream of SW-8 <br />SW-5 McClane Creek above mine site at culvert inlet <br />SW-6 Munger Creek below mine before north split <br />SW-7 Munger Creek above Mine <br />SW-8 East Salt Creek between Munger and McClane Creeks at bridge <br />SW-X McClane Creek at confluence with East Salt Creek <br />GW-1 Alluvium of East Salt Creek about 3 Miles above McClane -.TD 14.3' <br />GW-3 Alluvium of East Salt Creek just below Munger Canyon - TD 47.3' <br />GW-6 In Munger Canyon at the permitted waste rock disposal area - TD 18.8' <br />GW-9 Alluvium of East Salt Creek below proposed waste rock disposal area - TD 53.5 <br />Feet <br />GW-1 Total Depth 14.3 <br />GW-3 Total Depth 47.3 <br />GW-6 Total Depth 18.8 Depth revised when pipe was damaged <br />during gob pile construction. <br />GW-9 Total Depth 53.5