My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REVISION - 1/8/2009, 8:07:50 AM-JWD
DRMS
>
Public
>
REVISION - 1/8/2009, 8:07:50 AM-JWD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:36:08 AM
Creation date
1/8/2009 8:08:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008043
IBM Index Class Name
REVISION
Doc Date
11/28/2008
Doc Name
Request for Bond Adjustment
From
Powertech (USA) Inc.
To
DRMS
Type & Sequence
MD1
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT C <br />SUPPLEMENTAL REPORT-ACTUAL COSTS <br />Applying the above calculations to the current NOI request, we can estimate the total cost for proper <br />plugging and abandonment of the 15 well bores and 1 prospecting hole, and associated drillsites listed <br />on the current NOI (see Itemization Table). In summary, the total cost calculated is approximately <br />$40,662.82 (Cell 'S24'). Final grading and seeding are the only reclamation activities not covered in this <br />estimate. Until further adjustments are made for plugging and abandonment operations, Powertech <br />(USA) Inc. proposes plugging and abandonment rates outlined on the attached Itemization Table. <br />Powertech (USA) Inc. requests the opportunity to adjust rates in the future when hole-diameter, rig <br />rates, material costs, and plugging and abandonment efficiency change. <br />Thank you very much for your time and consideration in this matter. We look forward to working with <br />the Colorado Division of Reclamation and Mining Safety throughout the project. <br />DT <br />Enclosures: Itemization Table; Davis Drilling Reports and Invoices for 07/28/08, 08/07/08, 09/09/08, <br />09/10/08, and 09/20/08; Baroid IDP Shur-gel and 3/8" HolePlug Data Sheets; ACE Hardware Portland <br />Cement Price Sheet; Preferred Pump Mud Invoices <br />
The URL can be used to link to this page
Your browser does not support the video tag.