Laserfiche WebLink
Pond 013 <br />As-Built Report <br />Postmine Storage Capacity Addendum <br />TABLE OF CONTENTS <br /> <br /> <br />Page <br />Introduction 13-20.1-1 <br />Existing Condition Analysis 13-20.1-1 <br />SCS Curve Number and "k" Factor 13-20.1-2 <br />Precipitation and Storm Event 13-20.1-3 <br />Sedimentology 13-20.1-3 <br />Reclaimed Condition Storage Capacity 13-20.1-3 <br />Spillways 13-20.1-4 <br />Summary 13-20.1-4 <br />Revised Storage Capacity Certification 13-20.1-4 <br />LIST OF APPENDIX <br />Appendix 13-20.1-A - 10-Year, 24-Hour SEDCAD Demonstration <br />Appendix 13-20.1-B - 25-Year, 24-Hour SEDCAD Demonstration <br />Appendix 13-20.1-C - Emergency Spillway Outflow Channel Requirements <br />for Postmine Conditions <br />TR-37 <br />13-20.1-i <br />Revised 02/08 <br />