Laserfiche WebLink
Attachment 13-20 <br />Pond 013 As-Built Report <br />Introduction <br />This attachment presents the Pond 013 As-Built Report. The report <br />consists of two parts: Part I, Postmine Storage Capacity Addendum, and <br />Part II, Pond As-Built Report. <br />Part I presents updated SEDCAD demonstrations that incorporate recent <br />(2007) changes to the drainage and sediment control network and, <br />account for current (postmine) watershed conditions in support of <br />retaining Pond 013 as a permanent postmine feature. Part II presents <br />the as-built construction documentation (TR-26, dated September 2004). <br />r~ <br />• <br />TR-37 Revised 02/08 <br />